Laserfiche WebLink
San Joaquin County DIRECTOR <br /> Donna Heran,REHS <br /> Department Environmental Health De <br /> �o._�• .co p ASSISTANT DIRECTOR <br /> 2 y 600 East Main Street Laurie Cotulla,REHS <br /> Q: .a <br /> U): T :{ Stockton, California 95202-3029 <br /> PROGRAM COORDINATORS <br /> •' Carl Borgman,REHS <br /> !• <br /> 0.... Mike Huggins,REHS,RDI.��P Website: www sjgov.org/ehd Margaret La orio, REHS <br /> /FOR Phone: (209)468-3420 Robert McC ellon, REHS <br /> Fax: (209) 464-0138 .teff Carruesco,REHS, RDI <br /> Kasey Foley, REHS <br /> April 25, 2008 C (OPY <br /> Jack Coffelt/Carrie Miller Sent via Fax and Mail <br /> Elite IV Contractors, Inc. <br /> 2535 Wigwam Drive <br /> Stockton, CA 95205 <br /> Fax: (209)461-6342 <br /> Subject: Marigold Shell,6131 Pacific Ave,Stockton, CA 95207 (SR0053943) <br /> The San Joaquin County Environmental Health Department(EHD)has completed the review of <br /> the application for permit to perform an EVR phase II upgrade and cold start. The permit has <br /> been approved with the following conditions. <br /> Conditions of approval: <br /> 1. Contact the local fire department, local planning or building department and the San <br /> Joaquin Valley Air Pollution Control District for any applicable permits. <br /> 2. Any changes shall be submitted to the San Joaquin County Environmental Health <br /> Department(EHD) for approval prior to commencing work.All new addenda supercede <br /> the previous ones. <br /> 3. Before the alarm history is cleared by the"cold start", a current printout must be <br /> created and available for EHD inspection. Inspection may occur during the monitoring <br /> system functionality test. <br /> 4. If the under dispenser containment (UDC)pans are being modified to add electrical <br /> penetration fittings and the electrical penetrations are not significantly higher than the <br /> product line penetrations, an approved test must be performed to determine the integrity <br /> of the UDC pans. <br /> 5. Contact Garrett Backus(209-468-2986)to arrange the following inspection(s)(a 48-hour <br /> notice is required): <br /> a. The EHD must witness the testing of the functionality of the monitoring system <br /> to ensure that monitoring has been restored to meet the requirements of <br /> California Code of Regulations Title 23 and the Health& Safety Code. <br /> b. The EHD must witness testing of the UDCs. <br /> 6. If concrete is being broken near the UST system,pipeline and tank integrity testing must <br /> be performed by a SWRCB licensed tank tester in accordance with the manufacturer's <br /> guidelines. Results must be received by the EHD within seven days of returning the <br /> facility to operating condition. <br /> Page 1 of 2 <br />