Laserfiche WebLink
d. Each person installing or testing any component must hold a certificate of <br /> training from the manufacturer of that component. <br /> 6. Contact Ray von Flue(468-9848)to arrange the following inspections(a 48-hour notice <br /> is required): <br /> a. Twenty-four hour lake test(or equivalent)on the Regular 87, Premium 91 and <br /> Diesel fill sumps. <br /> b. Witness soap test on repaired/replaced fittings for diesel secondary pipe. <br /> c. Verify that diesel secondary maintains pressure per manufacturers instructions <br /> for sixty minutes. <br /> d. Verify that the 87 regular, 91 Premium, and Diesel vent lines maintain pressure <br /> per manufacturers instructions for sixty minutes. <br /> e. One-hour hydrostatic test(or equivalent)on the Diesel spill bucket. <br /> f. Verify five gallon capacity,corrosion protection and drain valve operation for <br /> Diesel spill bucket. <br /> g. Verify the three gallon per hour leak test on the Diesel PLLD. <br /> 7. A"Certificate of Compliance for Underground Storage Tank Installation Form C" shall <br /> be submitted by the owner or the owners'agent [pursuant to(CCR)2635(d)] before this <br /> upgrade will be considered complete by EHD. <br /> 8. Permit expires January 16 2008. <br /> Ray von Fliie,REHS <br /> Senior Registered Environmental Health Specialist <br />