Laserfiche WebLink
SWRCB,January 2002 Page 6 of <br /> 8. FILL RISER CONTAINMENT SUMP TESTING <br /> Facility is Not Equipped With Fill Riser Containment Sum s <br /> Fill Riser Containment Sumps are Present,but were Not Tested ❑ B <br /> st Method Developed By: ❑Sump Manufacturer ❑Industry Standard ❑Professional Engineer <br /> ❑Other(Specify) <br /> Test Met ho Used: ❑Pressure ❑Vacuum ❑Hydrostatic <br /> ❑Other(Spec) <br /> Test Equipment Use . Equipment Resolution: <br /> n. <br /> Fill Sump# Fill Sump# Fill Sump# Fill sume# <br /> Sump Diameter: IN, ,a <br /> Sump Depth: <br /> Height from Tank Top to Top of <br /> Highest Piping Penetration: <br /> Height from Tank Top to Lowest <br /> Electrical Penetration: <br /> Condition of sump prior to <br /> testing: <br /> Portion of Sump Tested <br /> Sump Material: <br /> Wait time between applying <br /> pressure/vacuum/water and <br /> starting test: <br /> Test Start Time: <br /> Initial Reading : <br /> Test End Time: <br /> Final Reading(RF): <br /> Test Duration: <br /> -Change in Reading (RF—R,): <br /> Pass/Fail Threshold or Criteria <br /> Test Result: ❑ Pass ❑Fail ❑ Pass ❑Fail ❑ Pass ❑FaI ❑ Pass ❑Fail <br /> Is there a sensor in the p? ❑Yes ❑No ❑Yes ❑No ❑Yes ❑No ❑Yes ❑No <br /> Does the sensor ala when ❑yes ❑No ❑NA <br /> either product or ater is ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Y ❑No ❑NA <br /> detected? <br /> Was sens removed for testing? ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑ ❑NA <br /> W sensor properly replaced and ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA 1 ❑Yes ❑No ❑NA <br /> erified functional after testing? <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for jailed tests) <br />