My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2002 - 2010
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
6131
>
2300 - Underground Storage Tank Program
>
PR0231223
>
COMPLIANCE INFO_2002 - 2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/16/2019 3:26:44 PM
Creation date
12/16/2019 1:48:18 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2002 - 2010
RECORD_ID
PR0231223
PE
2361
FACILITY_ID
FA0002324
FACILITY_NAME
Pacific Service Station
STREET_NUMBER
6131
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
09746418
CURRENT_STATUS
01
SITE_LOCATION
6131 PACIFIC AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
473
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Jul 15 05 01 : 27p J. neakin 925-803-1557 p. l <br /> y . <br /> CONSTRUCTION & SERVICES, INC. <br /> 7172 Regional St. #139 <br /> Dublin, CA. 94568 <br /> Jeff Deakin <br /> Phone 1-925-803-6969 1-925-803-1557 <br /> Cell # 1-925-997-3367 Email dc-nincoebcOnbay net <br /> Fax Transmittal <br /> TO.. <br /> Michele Le DATE: 7/18/05 <br /> R.E.H.S. Environmental Health Dept. <br /> San Joaquin County <br /> FAX N0. 1-209-468-3433 NO.OF PGS. 2 <br /> Re: Marigold Shell <br /> 6131 Pacific <br /> Stockton, Ca <br /> Dear Ms. Le , <br /> During the recent EVR upgrade at the above location DCM has <br /> possibly set the Vapor buckets (Only) a bit high, We would like to adjust the 3 <br /> vapor buckets only, the 3 fill buckets will be left in their existing positions and the <br /> concrete will only be removed from the Vapor buckets only - Just the 3 Vapor <br /> buckets will then be re-positioned approximately 1" lower and concrete will then <br /> be replaced. <br /> Before DCM starts to do this adjustment I wanted to notify you of <br /> our intent and to find out if could make this adjust under the most recent permit <br /> or if needed to re-open the permit, new permit- What would you require? <br />
The URL can be used to link to this page
Your browser does not support the video tag.