Laserfiche WebLink
SWRCB,January 2002 Page i{_of�( <br /> 6. PIPING SUMP TESTING <br /> 'rest Method Developed By: ❑Sump Manufacturer ❑Industry Standard X Professional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: ❑Pressure ❑Vacuum X Hydrostatic <br /> ❑Other(Specify) <br /> Test Equipment Used: Caldwell Level Change Indicator Equipment Resolution: .002 <br /> Sump# 1 Sump#2 Sump#3 Sump# <br /> Sump Diameter: 48" 47" 47" <br /> Sump Depth: 39" 41" 40" <br /> Sump Material: Fiberglass Fiberglass Fiberglass <br /> Height from Tank Top to Top of 13" 14" 13" <br /> Highest Piping Penetration: <br /> Height from Tank Top to Lowest 14%2" 16" 15" <br /> Electrical Penetration: _ <br /> Condition of sump prior to testing: Dry Dry Dry <br /> Portion of Sump Tested' Water Line 17" Water Line 18" Water Line 17" <br /> Does turbine shut down when <br /> sump sensor detects liquid(both X Yes No NA X Yes No NA X Yes No NA <br /> product and water)?* <br /> Turbine shutdown response time Not Alarmed Not Alarmed Not Alarmed <br /> Is system programmed for fail-safe X Yes No NA X Yes No NA X Yes No NA <br /> shutdown?* <br /> Was fail-safe verified to be Yes X No NA Yes X No NA Yes X No NA <br /> operational?* <br /> Wait time between applying water 10 Minutes 10 Minutes 10 Minutes <br /> and starting test: _ <br /> Test Start Time: 8:40 8:45 9:30 <br /> Initial Reading(Rj): .001 .001 .001 <br /> Test End Time: 9:10 9:15 10:00 <br /> Final Reading(RF): .001 .001 .001 <br /> Test Duration: 30 Minutes 30 Minutes 30 Minutes _ <br /> Change in Reading(RF-Ri): 0 0 0 <br /> Pass/Fail Threshold or Criteria: .005/30 Minutes .005/30 Minutes .005/30 Minutes <br /> Test Result: X Pass ❑ Fail X Pass ❑Fail X Pass Fail Pass Fail <br /> Was sensor removed for testing? X Yes ❑No ❑NA X Yes ❑No ❑NA X Yes ❑No ❑NA Yes ❑No ❑NA <br /> Was sensor properly replaced and X Yes ❑No ❑NA X Yes ❑No ❑NA X Yes ❑No 0 NA Yes ❑No ❑NA <br /> verified functional after testing? <br /> Comments— (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> If the entire depth of the sump is not tested, specify how much was tested. If the answer to aof the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire sump must be tested. (See SWRCB LG-160) <br />