Laserfiche WebLink
AUG-21-2004 17:21 SERVICE STATION SYSTEM 4oe 971 0135 P.04 <br /> Monitoring System Certification-Pab_3 of 3 <br /> Site Address: 6131 Pacific Ave. @ Porter Date of Testing/Servicing: 7/26/04 <br /> F. In-Tank Gauging/SIR Equipment_ K Check this box if tank gauging is used only for inventory contro' <br /> ❑ Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Complete the following checklist: <br /> ❑Yes ❑No* Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br /> ❑Yes p No* Were all tank gauging probes visually inspected for damage and residue buildup? <br /> ❑Yes ❑No* Was accuracy of system product level readings tested? <br /> a Yes ❑ No* Was accuracy of system water level readings tested? <br /> ❑Yes ❑ No* Were all probes reinstalled properly? <br /> p Yes ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> *In Section H below,describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors(LLD): p Check this box if LLD's are not installed. <br /> Complete the following checklist: <br /> 11 Yes ❑No* For equipment start-up or annual equipment certification was a leak simulated to verify LLD performance? <br /> ❑ N/A (Check all that apply) Simulated leak reate: Qg 3 g.p.h. (1.); ❑ 0.1 g.p.h.(2); ❑ 0.2 g.p.h-(2.)- <br /> Notes: 1. Required for equipment start-up certification and annual certification- <br /> 2. Unless mandated by local agency,certification required only for electronic LLD start-up. <br /> pg Yes ❑ No* Were all LLD's confirmed operational and accurate within regulatory requirements? <br /> ej Yes ❑No* Was the testing apparatus properly calibrated? <br /> ❑Yes ❑ No* For mechanical LLD's,does the LLD restrict product flow if it detects a leak? � <br /> Qg N/A <br /> ja Yes ❑No* For electronic LLD's,does the turbine automatically shut off if the LLD detects a leak? <br /> ❑N/A <br /> pg Yes ❑No* For electronic LLD's,does the turbine automatically shut off if any portion of the monitoring system is disabled <br /> ❑N/A or disconnected? <br /> N Yes 0 No* For electronic LLD's,does the turbine automatically shut off if any portion of the monitoring system <br /> ❑N/A malfunctions or fails a test? <br /> K Yes a No* For electronic LLD's,have all accessible wiring connections been visually inspected? <br /> ❑N/A <br /> Ig Yes ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> *In Section H below,describe ho rw and when these deficiencies were or will be corrected. <br /> H. Comments: <br />