Laserfiche WebLink
NEN UNDERGROUND STORAGE TANKS - PLAN ADDITIONf CORRECTION SHEET <br /> The following checked and/or underlined items are to be addressed on plans: <br /> GENERAL <br /> 1. Provide the name and address of the facility. <br /> Provide the name, address, and phone numbers of the contractor(s) . facility <br /> 0 owner(s). and operator(s). <br /> OL3. Provide four complete sets of plans. (One to be retained by this office). <br /> rn clude specification sheets, equipment brochures. monitoring. and response <br /> plans. <br /> uk 4. Provide plans to scale in nonerasable blueprint. <br /> CONSTRUCTION STANDARDS <br /> 1 . <br /> Location(s) and number of tanks. ? - 12,060 G,4u t A UC-6Ts <br /> Type of tank(s) to be installed. <br /> A. Steel clad with fiberglass reinforced plastic. <br /> 1 . 35.000 to 40.000 volt Holiday Test required before "setting" tank(s) <br /> in ground. <br /> B. berglass , OW E�4S-C&P—m l t­,Gr <br /> 10 Striker plate dimensions and materials. <br /> Striker plates under all accessible openings. <br /> C. Nonclad steel <br /> 1 . Cathodic protection provided (including nuts, bolts, washers, etc. ). <br /> a• Approved by a corrosion engineer or NACE ,technician. <br /> b. Document stating inspection method and frequency (Minimum semi- <br /> annual inspection required). <br /> D. Other types of tanks <br /> I . Construction specification standards for durability. <br /> Tank Capacity (List specific gallonage) . CZ,Loo Cr-Fii�t�NS <br /> Contents to be stored in each tank (Be spec i fic). U1 J.L. <br /> A. Verification of product compatability with the tank(s) , piping, monitoring <br /> device(s) , epoxy or silicone glues , etc. <br /> I . List testing organization and approval . <br /> Ok 5. Provide manufacturers written installation instructions. (Include all piping, <br /> monitors , tan s . etc. <br /> Note - NFPA 30 Test required before covering tank and systems. NFPA 30 Test <br /> is required-on BOTH the Primary and Secondary containment systems. <br /> Double walled tanks using pressure or vacuum testing to monitor annular <br /> space are exempt from testing secondary container. <br /> Note - NFPA 329 "Precision Test" required upon completion of installations. <br /> ne—te'st result copy to be sent directly to tlits department from the <br /> testing company. <br />