My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_1990
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
6131
>
2300 - Underground Storage Tank Program
>
PR0231223
>
INSTALL_1990
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/16/2019 4:49:09 PM
Creation date
12/16/2019 4:13:58 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1990
RECORD_ID
PR0231223
PE
2361
FACILITY_ID
FA0002324
FACILITY_NAME
Pacific Service Station
STREET_NUMBER
6131
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
09746418
CURRENT_STATUS
01
SITE_LOCATION
6131 PACIFIC AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MAR 07 '90 16:54 R.H.L. RAMENTO 9.166464679 P.9/14 <br /> TITLE: <br /> Assembly Proceedure '^`aG,.�,�, . <br /> "o. 7F S - 125 <br /> For Secondary <br /> Containment Flex ® PAGE 2 of 3 <br /> Connectors FLUID SYSTEMS <br /> aY' DATE <br /> WINDSOR, CT. 06095 APPD: <br /> DATE: <br /> SPECIFICATION <br /> DOR NO: PID NO. <br /> Proceedure: I <br /> 1) Sand entire outer surface of a 3 to 4 'inch section <br /> of secondary piping from the end. w <br /> J <br /> 2) Clean outer surf <br /> Mix and a ace using fiberglass. pipe cleaner. <br /> apply fiberglass pipe epoxy ad!,esive to sanded section of 0 <br /> pipe following insttruc'tions supplied RAied wlth kit. W <br /> 0 <br /> 3) Insert the 3 to 4 inches of secondary piping into a <br /> the hose boot. Z <br /> w <br /> 4) using d 64 stainless steel hose clamp, clamp the <br /> end tightly. <br /> x <br /> 5) Allow adhesive to dry according to instruction on <br /> the adhesive Table. <br /> Proceedure: II <br /> Q. <br /> 1). Pull capping boot over hex nut of hose assembly and <br /> lightly elamp. usin the <br /> (see chart) g proper sine stainless steel hose clamp. <br /> d <br /> o <br /> 0 <br /> 2) Cut a 3 to 4 inch long fiberglass splice out of 3 w <br /> inch secondary or primary piping. <br /> z <br /> Splice. 3) Sand the entire outer surface of the fiberglass <br /> W <br /> 4) Clean outer surface using fiberglass <br /> Mix and apply the fiberglass Pape cleaner, o <br /> 9 pipe epoxy adhesive to adaptor folio- Z <br /> wing instructions supplied with kit. <br /> N <br /> 5) Insert adaptor a <br /> boot and ca p approximately 1 1/2 to 2 inches into z <br /> Aping boot. � <br /> W <br /> 6) . Using a # 64 hose clamp, clamp ends tightly. <br /> 7) Tighten the hose clamp on capping boot from step o <br /> # 1. <br /> a <br /> 8) Allow adhesive to dry according to instructions on <br /> the adhesive lable. Q <br /> Proceedure: III <br /> z <br /> N 1) Pull capping boot over hex nut of hose assembly and � <br /> lightly clamp using the proper size stainless steel hose clamp. (see chart) <br /> CK9 <br /> .- z <br />
The URL can be used to link to this page
Your browser does not support the video tag.