Laserfiche WebLink
Jack Colberg <br /> Colberg Boat Works <br /> Task <br /> 2-- <br /> Task Amount Pre-Approved Comments <br /> Sample 6 MW 1,300 <br /> Report 880 Submit report with the next <br /> reimbursement request. <br /> TOTAL PRE-APPROVED 12,255 <br /> • The actual costs and scope of work performed must be consistent with the pre-approval for it to <br /> remain valid. <br /> • The work products must be acceptable to the County and the Regional Water Quality Control <br /> Board. <br /> • It is my opinion that it is unnecessary to obtain three bids for this scope of work;the Fund's three <br /> bid requirement is waived for this scope of work. <br /> • If a different scope of work becomes necessary,then you must request pre-approval of costs on <br /> the new scope of work. <br /> • Although I have referred to the APEX proposal in my pre-approval above, please be aware that <br /> you will be entering into a private contract: the State of California cannot compel you to sign <br /> any specific contract. This letter pre-approves the costs as presented in the proposal dated <br /> February 13, 1997 by APEX for conducting the work approved by the County for implementing <br /> the February 13, 1997,APEX workplan. <br /> I also want to remind you that the Fund's regulations require that you obtain at least three bids,or a <br /> bid waiver from Fund staff, from qualified firms for all necessary corrective action work. The <br /> legislation governing the Fund requires that the Fund assist you in procuring contractor and <br /> consultant services for corrective action. If you need assistance in contracting for corrective action <br /> services, don't hesitate to call me. <br /> Please remember that it is still necessary to submit the actual costs of the work as explained in the <br /> Reimbursement Request Instructions to confirm that the costs are consistent with this pre-approval <br /> before you will be reimbursed. To make this easier, insure that your consultant prepares his <br /> invoices to match the format of the original estimate, and provides reasonable explanations for <br /> any changes made in the scope of work or increases in the costs. When the invoices are submitted <br /> you must include copies of all: <br /> • subcontractor invoices, <br /> • technical reports, when available, and <br /> • applicable correspondence from the County. <br /> Please call if you have any questions; I can be reached at(916)227-4322. <br /> Our mission is to preserve and enhance the quality of California's water resources,and <br /> .• Recycled Paper ensure their proper allocation and efficient use for the benefit ofpresent and future generations. <br />