Laserfiche WebLink
'h' M <br /> CHRONOLOGY <br /> Colberg Boat Works Inc. <br /> 848 W Fremont St. <br /> Stockton CA 95203 <br /> 05/16/86 Removed 4 underground storage tanks (UST): <br /> 1) Three UST in a cluster: one 8,000 gallon diesel UST (Tank#1), and <br /> two 550--gallon diesel UST (Tank#2,Tank#3) <br /> 2) One 1,000-gallon unleaded gasoline UST (Tank #4). Excavation was <br /> left open until.1988. <br />! <br /> Laboratory results of the soil samples from beneath the gasoline tank <br /> indicated contamination. Analytical results of the samples beneath the diesel <br /> tanks were not analyzed for extractahle TPH and the detection limits for the <br /> volatile constituents were high. <br /> 02/24/88 Date of Unauthorized Release Report (UAR). <br /> 03/14/88 Soil samples and grab groundwater sample were collected from the open <br /> excavation of Tank #4. Analytical results of the soil samples were non <br /> detect with high detection limits. The groundwater sample had benzene at <br /> 1200 ug/l. <br /> 11/28/94 Date of work plan to advance 10 to 14 soil probes at the site. <br /> 12/12/94 Probes (P-1 through P-11) advanced around the site at both former UST <br /> areas and former boat work repair areas. Soil samples were collected for <br /> laboratory analyses looking for petroleum related organics, metals,and <br /> halogenated volatiles (solvents). Results of the water sample from P-3, <br /> approximately 20 feet south of the gasoline tank,were 28 ug/1 of Benzene. <br /> 12/113/94 A "Notice of Reimbursement"was sent to the responsible party as <br /> notification that the site had been entered into the San Joaquin County <br /> Environmental Health Department (EHD) Local Oversight Program (LOP). <br /> 01/23/95 Date of the Phase II Site Assessment Report of the December 1994 work. <br /> 04/03/95 Date of the Addendum to the 1/23/95 report. <br /> 02/13/97 Date of work plan to install 6 monitoring wells. <br /> 07/28-29/97 Installed 6 monitoring wells (MW) around the former diesel tank cluster <br /> (MW4 through MW-6) and gasoline tank (MW-1 through MW-3). <br /> 08/21/97 Date of"Results of Subsurface Investigation" reporting July 1997 work. <br />