Laserfiche WebLink
DRAFT <br /> SITE SAFETY PLAN <br /> L CLIENT: Ms. Lynn Swanson <br /> JOB LOCATION: Colberg Board Works <br /> 401 North Stockton Street <br /> Stockton, California <br /> PLAN PREPARED BY: Chris A. LaRose DATE: March 23, 2001 <br /> APPROVED BY: Gary H. Hall DATE: March 23, 2001 <br /> OBJECTIVES: Complete six geoprobes to 15-feet below ground surface and <br /> collect soil and groundwater samples. <br /> DATE(S) OF INVESTIGATION: Pending <br /> SAFETY SUPERVISORS: GHH: Gary H. Hall, P.E. <br /> ON-SITE: Chris A. LaRose <br /> SUBCONTRACTOR: Fisch Environmental(C-57 #683865) <br /> L ON-SITE HAZARDS:. Soil and groundwater potentially contaminated with petroleum <br /> hydrocarbons, overhead and underground utilities. <br /> SITE CONTROL: Delineators and appropriate_ barricades to direct away from work <br /> area. <br /> PERSONAL PROTECTIVE EQUIPMENT: Level CID-Gloves, steel toed boots,hard <br /> hats; coveralls&respirator with organic <br /> cartridges on-site. On-site personnel will be <br /> Level C certified and have PPE on-site. <br /> SURVEILLANCE EQUIPMENT: PID and FAD. <br /> DECONTAMINATION PROCEDURES: Personal- Wash hands prior to eating, <br /> drinking, smoking and before leaving site; <br /> clean clothes and respirator. <br /> Equipment - Clean equipment before <br /> leaving site. <br />