My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
848
>
3500 - Local Oversight Program
>
PR0545098
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2019 3:23:59 PM
Creation date
12/17/2019 3:08:03 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0545098
PE
3528
FACILITY_ID
FA0015639
FACILITY_NAME
COLBERG INC
STREET_NUMBER
848
Direction
W
STREET_NAME
FREMONT
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
13546010
CURRENT_STATUS
02
SITE_LOCATION
848 W FREMONT ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
127
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
L E <br /> ADDITIONAL ASSESSMENT WORKPLAN <br /> COLBERG1 BOAT WORKS <br /> APRIL 2001 <br /> Groundwater samples will be collected.using new disposable bailers at each well. The <br /> groundwater sample will be decanted from the.bailer into laboratory provided containers, placed <br /> into chilled coolers and transported to a state certified laboratory under proper GOC <br /> documentation. <br /> Groundwater Analyses <br /> The groundwater will be analyzed by a California certified laboratory in accordance with state <br /> guidelines and EPA protocol. The groundwater samples will be analyzed for TPH G, BTEX, 1,2- <br /> DCA, EDB, and fuel oxygenates using-EPA Methods 8015M, 8020 and 8260B, respectively. <br /> Site Survey <br /> Following installation of the groundwater monitoring wells, the location and elevation of the wells <br /> will be surveyed to the nearest 0.01 vertical foot. The elevation will be tied to the existing well <br /> t casing elevations. Static groundwater.levels will be measured to the nearest 0.01-foot. These <br /> data will be added to the site's data base. <br /> SUMMARY REPORT <br /> GHH will prepare an AAR to document this phase of work. The report will include: GHH's <br /> interpretation of information gathered during the investigation;.detailed descriptions of the <br /> methodologies used to collect and analyze the data; analytical results;the total estimated mass of <br /> k impacted soil and groundwater;the estimated rate:of transport of groundwater away from the <br /> site; copies of laboratory certificates with COC documentation; subcontractor reports; <br /> conclusions.and recommendations. <br /> QUARTERLY MONITORING <br /> Quarterly sampling of the new wells will be initiated.. Monitoring wells MW-1, MW-2, MW-3 <br /> and MW-7 (new well)will be included in the sampling program Depths to groundwater <br /> measurements will be taken and the groundwater monitoring wells will be purged and sampled. <br /> Groundwater samples will be analyzed for the same parameters as previously identified unless <br /> otherwise directed by the County. A Quarterly Monitoring Report(QMR) will be issued <br /> following each quarterly monitoring event. <br /> 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.