Laserfiche WebLink
Task 3 - Groundwater Monitoring <br /> Monthly monitoring of DO, redox, pH, electrical conductivity, temperature, and <br /> groundwater elevations are proposed for all four wells. The monthly readings will <br /> be conducted for a period of three months following placement of the ORCO. At <br /> the conclusion of the third month, a second groundwater sample will be collected <br /> from well MW-2 and analyzed for the following parameters to evaluate ongoing <br /> indigenous conditions: <br /> Heterotrophic Plate Count <br /> Phosphate <br /> Ammonia Nitrogen <br /> Chemical Oxygen Demand <br /> Biological Oxygen Demand <br /> Additionally, quarterly groundwater monitoring and sampling will be conducted <br /> for the three perimeter monitoring wells at this time. <br /> The ORCO is anticipated to last from three to six months. At the end of the third <br /> month, the potency of the ORCO will be evaluated and, if found to be sufficient, <br /> a second three-month monitoring episode will be conducted. <br /> Task 4 - ORCO Evaluation <br /> Upon depletion of the ORCO, the sock will be removed and the wells will be <br /> allowed to stabilize. Upon stabilization, a minimum of two complete auart� <br /> sampling and monitoring episodes will be conducted. At least one of the <br /> sampling episodes will include analysis for petroleum oxygenates. Results of the <br /> quarterly sampling, along with the monthly data measured during the ORCO <br /> placement, will be used to evaluate the effectiveness of ORCO at the site. <br /> If found to be effective, then the degree of biodegradation will be evaluated and <br /> a decision made as to whether additional ORCO should be installed. If <br /> warranted, a second application and/or a more aggressive approach to the <br /> ORCO placement will be proposed. <br /> Task 5 - Mass Balance Calculation <br /> Per your request, as part of the ORCO evaluation, a mass balance calculation <br /> will be performed. The mass balance calculation will assess, as best possible, <br /> the approximate quantity of contaminants removed and/or remediated relative to <br /> the approximate quantity initially released to the environment. <br /> Task 6 - Brief Summary Report <br /> A brief report will be prepared summarizing the results of the ORCO placement <br /> and the evaluation conclusions. Included in the report will be recommendations <br /> for additional ORCO placement, if warranted. The report will also present the <br /> mass balance quantities calculated from Task 5. <br /> JJW GEOSCIENCES Inc. <br />