Laserfiche WebLink
DEL-TECHGeotechnicalSupport Services <br /> MONITORING WELL FIELD LOG <br /> RQJCT ifAME <br /> .. ............... <br /> -w <br /> PH G1 BTX <br /> : M : : ........ <br /> 91 ifs i"r�mt 5 ►fPl. T <br /> X (s, <br /> R0 XC A::1 <br /> ........... <br /> ............ <br /> 0:'b:.jF: V.0011:LA13a: <br /> CLIENT: HUNTER &ASSOCIATES DATE: 03/28/95 <br /> PROJECT MANAGER: BILL HUNTER SAMPLE LOCATION: MW-3 <br /> SAMPLER; DON LIGHT START TIME: <br /> GROUNDWATER: XXX 11VADOSE: OTHER: P.I.D. READING 0.0 PPM <br /> CASING ELEVATION: (FEET MSL) CASING DIAMETER: 4 INCH <br /> DEPTH TO WATER:8.54 FEET CALCULATED PURGE VOLUME: 13.5 GAL. <br /> DEPTH OF WELL: 29.28 FEET CTUAL VOLUME PER PURGE: 115 GAL, <br /> ............L....L" L" -": <br /> .. ........ . <br /> VICmjm:�i:;:�x�OTH R <br /> ........... ...... <br /> CALOR <br /> IMf <br /> rTEMP <br /> U ...... ... ........ <br /> .... .. .... <br /> . :,:gakwns.. ....7T <br /> ........... <br /> 0 7.2 984 27.2 CLEAR NO ODOR <br /> 13.5 7.6 986 22.2 <br /> 27.0 7,7 982 22.0 <br /> 40.5 7.6 984 21.8 <br /> PURGE METHOD : CENTRIFUGAL PUMP, <br /> SAMPLE METHOD: 1 FOOT STAINLESS STEEL BAILER. <br /> DEPTH TO WATER AFTER PURGE: 8.60' DEPTH TO WATER AT SAMPLE TIME: <br /> WELL INTEGRITY: CAP AND SEAL ARE SECURE/ LOCK IS INSTALLED. <br /> REMARKS: GOOD RECHARGE, <br /> WEATHER: CLEAR SKIES, <br /> QUALITY CONTROL: ALL PURGING EQUIPMENT AND SAMPLING EQUIPMENT WAS CLEANED <br /> IN THE FIELD WITH ALCONOX. <br /> NEW NITRILE GLOVES WERE WORN AT ALL TIMES. <br /> WELL LOCATION: WELL IS LOCATED SOUTH EAST ON SIDEWALK. <br /> CONTAINMENT: D.O.T.-17 STEEL DRUM. <br /> INSTRUMENTATION. ORION pHI/TEMPERATURE METER 2 POINT pH CALIBRATION (4.0 & 7.0) <br /> ORION CONDUCTIVITY METER <br /> ENVIRONMENTAL INSTRUMENTS SLOPE METER <br /> KECK PRODUCT INTERFACE METER <br /> THERMODYNE 580E PHOTO IONIZATION DETECTOR <br />