Laserfiche WebLink
is <br /> J <br /> 1} <br /> l <br /> Emergency equipment an location will include: � <br /> J j <br /> i <br /> # Portable eyewash bottles ' <br /> # Industrial first aid kit_ <br /> SITE SECURITY r <br /> i <br /> Access during all on--site activities will be restricted to author- <br /> ized personnel ONLY. All others must contact the Safety Coordinator <br /> /Project Manager or person-in--charge prior to entering or leaving <br /> the site. <br /> RECORD KEEPING <br /> ]] <br /> All safety records pertaining to the site characterization study <br /> will be maintained by the Safety Coordinator/Project Manager. They 3 <br /> will be made available to authorized persons upon request. <br /> AIF MONITORING <br /> II <br /> The Safety Coordinator/Project Manager will conduct periodic air <br /> monitoring using direct reading sampling equipment as necessary, <br /> iidependent on the known or anticipated conditions at the site. <br /> EMPLOYEE TRAINING AND INFORMATION <br /> r j <br /> All personel working with potentially hazardous materials have <br /> completed the certified 40 hour OSHA hazardous waste training � <br /> course, and have been instructed in the following areas: <br /> y <br /> # Workers are aware of the potential hazards that may be <br /> encountered. <br /> # F nowt edge and skills necessary to perform. the work. with <br /> minimal risk to workers health and safety.. <br /> # Familiarization with the Site Safety plan and site--specific <br /> requirements. <br /> The general training plan for all sites encompasses: <br /> Y <br /> # Potential physical and chemical health hazards. <br /> P <br /> r # Respiratory protection , rationale, use, .maintainance and fit f <br /> 3 testing. <br /> # Protective clothing , use and maintainance. <br />'f # Entry, exit , and decontamination procedures. <br /> # Documentation and record keeping procedures. <br /> ! . CONTINGENCY PLAN <br /> If an injury occurs, take the -following action: <br /> I <br />