Laserfiche WebLink
DEL-TECH Geotechnical Support Scrvices <br /> MONITORING WELL FIELD LOG <br /> 1996 <br /> PROJECT NAME: SAMPLE ANALYSIS-PERFORMED : NIA <br /> VALLEY SHOWCASE AMPLE TIME: <br /> 921 WEST FREMONT AMPLE CONTAINER(S): <br /> STOCKTON, CA ANALYSIS PERFORMED BY: <br /> CLIENT: HUNTER&ASSOCIATES DATE: 11/05/1996 <br /> PROJECT MANAGER: BILL HUNTER AMPLE LOCATION: MW-2 <br /> AMPLER: DON LIGHT START TIME: <br /> GROUNDWATER: XXX ]�ADOSE: OTHER: <br /> CASING ELEVATION: FEET MSLCASING DIAMETER: 41NCH <br /> DEPTH TO WATER: 10.38 FEET CALCULATED CASING VOLUME: 12.15 GAL. <br /> DEPTH OF WELL: 29.00 FEET TOTAL VOLUME PURGED: 0.0 GAL. <br /> TIME VOLUME pH E.C. TEMP. O.R.P. COLOR OTHER <br /> gallons units Ur6hasfcm Degrees C Molts Visual <br /> 0 <br /> NOT SAMPLED <br /> PURGE METHOD : NIA <br /> SAMPLE METHOD: N/A <br /> DEPTH TO WATER AFTER PURGE: DEPTH TO WATER AT SAMPLE TIME: <br /> WELL INTEGRITY: CAP AND SEAL ARE SECURE, NO LOCK INSTALLED. <br /> REMARKS: GOOD RECHARGE. <br /> WEATHER: CLEAR SKIES. <br /> QUALITY CONTROL: ALL PURGING EQUIPMENT AND SAMPLING EQUIPMENT WAS CLEANED <br /> IN THE FIELD WITH STEAM CLEANER &ALCONOX. <br /> NEW NITRILE GLOVES WERE WORN AT ALL TIMES. <br /> WELL LOCATION: NORTHERN MOST. <br /> CONTAINMENT: <br /> INSTRUMENTATION: ORION pH/TEMPERATURE METER 2 POINT pH CALIBRATION (4.0 & 7.0) <br /> ORION CONDUCTIVITY METER <br /> YSI 3560 FLOWCELL CHAMBER 1 D.O. METER <br /> SOLINIST SLOPE METER 1 KECK PRODUCT INTERFACE METER <br /> THERMODYNE 580E PHOTO IONIZATION DETECTOR <br />