Laserfiche WebLink
■ S J C O G, Inc. <br /> 555 East Weber Avenue • Stockton,CA 95202 • (209)235-0600 • FAX(209)235-0438 <br /> e <br /> San Joaquin County Multi-Species Habitat Conservation&Open Space Plan (SJMSCP) <br /> SJMSCP RESPONSE TO LOCAL JURISDICTION(RTLJ) <br /> ADVISORY AGENCY NOTICE TO SJCOG,Inc. <br /> To: Alisa Goulart,San Joaquin County, Community Development Department <br /> From: Laurel Boyd, SJCOG, Inc. <br /> Date: December 30, 2019 <br /> Local Jurisdiction Project Title: PA-1700291 (SA,RAA) <br /> Assessor Parcel Number(s): 021-200-24 <br /> Local Jurisdiction Project Number: PA-1700291 (SA,RAA) <br /> Total Acres to be converted from Open Space Use: Unknown <br /> Habitat Types to be Disturbed: Natural and Urban Habitat Land <br /> Species Impact Findings: Findings to be determined by SJMSCP biologist. <br /> Dear Ms. Goulart: <br /> SJCOG, Inc. has reviewed the application referral for PA-1700291 (SA, RAA). This project consists of a Revisions of <br /> Approved Actions application to amend the size of the previously approved canopy for a new gas station (Use Type: <br /> Gasoline Sales-Combination). The canopy will increase from 1,372 square feet to 3,300 square feet. There will be no <br /> increase in the number of previously approved fuel pumps (up to four [4]) or above ground fuel tanks (up to two [2]). The <br /> existing market and deli will remain as approved (Use Type: Eating Establishment-Convenience). The project site is on <br /> the southeast corner of East Liberty Road and State Route 88, Clements (APN/Address: 021-200-24/21850 East Liberty <br /> Road, Clements). <br /> San Joaquin County is a signatory to San Joaquin County Multi-Species Habitat Conservation and Open Space Plan <br /> (SJMSCP). Participation in the SJMSCP satisfies requirements of both the state and federal endangered species acts, <br /> and ensures that the impacts are mitigated below a level of significance in compliance with the California Environmental <br /> Quality Act (CEQA). The LOCAL JURISDICTION retains responsibility for ensuring that the appropriate Incidental Take <br /> Minimization Measure are properly implemented and monitored and that appropriate fees are paid in compliance with the <br /> SJMSCP. Although participation in the SJMSCP is voluntary, Local Jurisdiction/Lead Agencies should be aware that if <br /> project applicants choose against participating in the SJMSCP, they will be required to provide alternative mitigation in an <br /> amount and kind equal to that provided in the SJMSCP. <br /> This project is subject to the SJMSCP and is located within the unmapped land use area. Per requirements of the <br /> SJMSCP, unmapped projects are subject to case-by-case review. This can be a 90 day process and it is recommended <br /> that the project applicant contact SJMSCP staff as early as possible. It is also recommended that the project applicant <br /> obtain an information package. http://www.sjcog.org <br /> After this project is approved by the Habitat Technical Advisory Committee and the SJCOG Inc. Board, the following <br /> process must occur to participate in the SJMSCP: <br /> ■ Schedule a SJMSCP Biologist to perform a pre-construction survey prior to any ground disturbance <br /> • SJMSCP Incidental take Minimization Measures and mitigation requirement: <br /> 1. Incidental Take Minimization Measures(ITMMs)will be issued to the project and must be signed by the project applicant prior to any <br /> ground disturbance but no later than six(6)months from receipt of the ITMMs. If ITMMs are not signed within six months,the applicant <br /> must reapply for SJMSCP Coverage. Upon receipt of signed ITMMs from project applicant,SJCOG,Inc-staff will sign the ITMMs. This <br /> is the effective date of the ITMMs. <br /> 2. Under no circumstance shall ground disturbance occur without compliance and satisfaction of the ITMMs. <br /> 3. Upon issuance of fully executed ITMMs and prior to any ground disturbance,the project applicant must: <br /> a. Post a bond for payment of the applicable SJMSCP fee covering the entirety of the project acreage being covered(the bond <br /> should be valid for no longer than a 6 month period),or <br /> b. Pay the appropriate SJMSCP fee for the entirety of the project acreage being covered,or <br /> C. Dedicate land in-lieu of fees,either as conservation easements or fee title;or <br /> d. Purchase approved mitigation bank credits. <br />