Laserfiche WebLink
October 11,2005 <br /> NOA Project Number: E05111B <br /> 6.0 PERCOLATION TEST INFORMATION <br /> 6.1 Percolation Test Locations <br /> A site map indicating the locations of the percolation test holes is included as Plate 1 in the appendix <br /> of this report. <br /> 6.2 Number of Percolation Tests <br /> One shallow percolation test was conducted on each parcel, and one deep percolation test on six <br /> parcels, for a total of 27 shallow and six deep percolation tests on the subject property. <br /> 6.3 Boring Preparation and Presaturation <br /> A total of six deep soil borings were advanced on the Site with a truck-mounted deep rock augur rig, <br /> and a total of 27 shallow soil borings were advanced on the Site with a hand augur from August 25 <br /> to September 2,2005. <br /> A 1.5-inch diameter PVC pipe with perforations on the bottom was used to measure the drop of / <br /> water in the percolation test boring. Approximately 2 inches of"pea gravel" were placed in the ((�?7) <br /> bottom of the open soil boring,then the PVC pipe was installed on top of the gravel. "Pea Gravel" l <br /> was then used to backfill in the annular space. <br /> Presaturation of the percolation test holes occurred 24 hours before each percolation test. The <br /> depth of water used to pre-soak was 12 inches above the bottom of the boring. <br /> 6.4 Condition of Borings After Presaturation <br /> After the 24-hour soak period,all presaturated holes were found to be intact and dry except for the <br /> shallow hole on parcel 23 on September 14, 2005 which had approximately five inches of water <br /> remaining. <br /> 6.5 Percolation Test Procedure <br /> Percolation tests were conducted for the shallow borings on parcels: 22 and 25 on September 1, <br /> 2005,parcels: 1, 15 and 16 on September 2,2005,parcels: 8, 9 and 11 on September 6,2005,parcels: <br /> 3, 5, 12 and 19 on September 7, 2005,parcels: 6, 7, 10 and 20 on September 8,2005,parcels: 24, 26 <br /> and 27 on September 9,2005,parcels: 2, 4, 13, 14, 17, 18 and 21 on September 12,2005,and / <br /> parcels: 22 and 23 on September 14,2005. Percolation tests were conducted for the deep borings on ( � <br /> parcels: 8 and 9 on September 6,2005,parcel: 12 on September 7,2005,parcel: 4 on September 12, <br /> 2005,and parcels: 22 and 23 on September 14, 2005 in accordance with the requirements of the <br /> EHD. A percolation test with a duration of four hours was performed for each hole. The last half <br /> an hour for all of the percolation tests were observed by an environmental health inspector from the <br /> 8 .,04 <br />