My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0004528 SSNL
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WILDWOOD
>
15445
>
2600 - Land Use Program
>
PA-0400364
>
SU0004528 SSNL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/18/2019 4:37:44 PM
Creation date
12/18/2019 4:31:41 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
FileName_PostFix
SSNL
RECORD_ID
SU0004528
PE
2632
FACILITY_NAME
PA-0400364
STREET_NUMBER
15445
Direction
E
STREET_NAME
WILDWOOD
STREET_TYPE
RD
City
RIPON
APN
20314001
ENTERED_DATE
7/6/2004 12:00:00 AM
SITE_LOCATION
15445 E WILDWOOD RD
RECEIVED_DATE
6/30/2004 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
October 11, 2005 <br /> NOA Project Number: E05111B <br /> 4.0 DISCUSSION OF NITRATE LOADING RESULTS <br /> 4.1 Total Nitrate Impact <br /> Based on the method and assumptions described,the result of the nitrate loading balance indicates <br /> that the proposed development on the proposed parcels should not cause a build up of nitrates in / <br /> the aquifer above 10 mg/L-N. However,a well water test has shown the groundwater <br /> concentration for nitrate was found to be 65.1 mg/L-NO3 (about 14.5 mg/L-N)which is fairly <br /> elevated. 0 i4G�/40t-'5� <br /> 4.2 Methods of Mitigation <br /> To minimize the impact to the aquifer from percolating effluent containing nitrogen,we would <br /> propose the following steps to be taken during construction the septic systems on the property. <br /> • Utilize standard leach line and seepage pit septic system with the following <br /> exceptions. <br /> • Minimum Septic Tank Sizes <br /> 2 bedroom-1200 <br /> 3 bedroom- 1600 <br /> 4 bedroom-2000 <br /> 5 bedroom-2400 <br /> 6 bedroom-3200 <br /> 7 bedrooms and above will require consultation. <br /> • Apply 4 inches of compost or peat in the bottom of the leach line trenches. Utilize <br /> gravel drain systems to improve denitrification. <br /> • The effluent should fill the entire leach line trench up to 6-inches before being <br /> allowed to flow into any seepage pit for final disposal. <br /> 5.0 CONCLUSIONS AND RECOMMENDATIONS <br /> Our office concludes that the Site is suitable for development with the use of a modified standard <br /> septic system as discussed in Section 4.2.Methods of Mitigation. Though the standard septic <br /> systems are"improved" to enhance denitrification,it is difficult to quantify the denitrification <br /> capacity of these systems. We would estimate on the order of a 5 to 10 percent increase in <br /> denitrification when compared to standard systems. All septic system construction should follow <br /> the San Joaquin County On-Site Wastewater Disposal Standards where applicable. <br /> 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.