My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
4040
>
2900 - Site Mitigation Program
>
PR0001963
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2019 11:04:15 AM
Creation date
12/19/2019 10:33:31 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0001963
PE
2950
FACILITY_ID
FA0003965
FACILITY_NAME
PG&E
STREET_NUMBER
4040
STREET_NAME
WEST
STREET_TYPE
LN
City
STOCKTON
Zip
95204
APN
11702001
CURRENT_STATUS
01
SITE_LOCATION
4040 WEST LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
123
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> C " E <br /> `r 11.1 PLACES OF REFUGE <br /> In the event of a site emergency requiring ,evacuation, all personnel will <br /> evacuate to a pre-designated area located in the'', support zone, a safe distance <br /> from the exclusion zone boundary ("hot lines") .'! The SSO will designate the <br /> assembly area prior to the start of work. <br /> f <br /> 11.2 FIRE <br /> Iit <br /> Type ABC fire extinguishers will be available onsite to contain and <br /> extinguish small fires. The local fire department should be summoned (911) in <br /> � C <br /> the event of any fire on site. j <br /> C11.3 INCIDENT REPORT <br /> In the event of an injury or illness,- work !i!is to be stopped until the SSO <br /> and the DHSM (John Danby-Sacramento) have determined the cause of the incident <br /> and have taken the appropriate action. Any injl� ry or illness, regardless of <br /> severity, is to be reported on the accident report form (see Attachments) . <br /> 11.4 OPERATION SHUTDOWN <br /> Under certain extreme hazardous situations the onsite geologist, SSO or SSR <br /> may request that site operations be temporarily suspended while the underlying <br /> Lhazard is corrected or controlled. During operation shutdown, all personnel will <br /> be required to stand upwind to prevent exposure to fugitive emissions. The SSO <br /> will have ultimate authority for operations shutdown and restart. <br /> i <br /> l <br /> i <br /> I <br /> I <br /> 'i <br /> I <br /> 'i <br /> I 1 <br /> CHEVMERC.H50 32 <br /> l <br />
The URL can be used to link to this page
Your browser does not support the video tag.