My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
4040
>
2900 - Site Mitigation Program
>
PR0001963
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2019 11:04:15 AM
Creation date
12/19/2019 10:33:31 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0001963
PE
2950
FACILITY_ID
FA0003965
FACILITY_NAME
PG&E
STREET_NUMBER
4040
STREET_NAME
WEST
STREET_TYPE
LN
City
STOCKTON
Zip
95204
APN
11702001
CURRENT_STATUS
01
SITE_LOCATION
4040 WEST LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
123
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> 12.0 TRAINING AND MEDICAL SURVEILLANCE <br /> i� <br /> All Dames & Moore site personnel will have met the requirements of 29 CFR <br /> 1910.120 (e) , including: <br /> o Forty hours or initial off-site 'training or its recognized <br /> equivalent; <br /> o Eight hours of annual refresher training for all personnel; <br /> s <br /> i <br /> o Eight hours of supervisor training for personnel serving as Site <br /> Safety Officers; <br /> o Three days of work activity under the!isupervision of a trained and <br /> experienced supervisor. <br /> All Dames & Moore site personnel are participating in medical surveillance <br /> programs that meet the requirements of 29 CFR 1910I1120(f) . The PM will maintain <br /> current copies of training certificates and statements of medical program <br /> participation for all site personnel. <br /> LIn addition, all Dames & Moore site personnel will review this HSP and sign <br /> a copy of the safety plan compliance agreement, which is found in the <br /> Attachments. The PM will maintain these agreements at the site, and forward them <br /> to the DHSM at the conclusion of the operation. <br /> Prior to the start of operations at the site, the SSO will conduct a site F <br /> L safety briefing, which will include all personnels involved in site operations. <br /> At this meeting, the SSO will discuss: <br /> j <br /> o Contents of this HSP, <br /> Co Types of hazards at the site and means for minimizing exposure to them, <br /> perform e bir ed <br /> will 1 <br /> o The type of monitoring that wp <br /> L <br /> II <br /> o Action levels for upgrade and downgrade ofpersonal protective equipment, <br /> G <br /> o Personal protective equipment that will bel used <br /> o Decontamination protocol, <br /> CHEVMERC.H50 33 <br /> L <br /> i <br /> L E <br /> �i I J <br />
The URL can be used to link to this page
Your browser does not support the video tag.