Laserfiche WebLink
t r <br /> 1 <br /> 13.0 RECORDKEEPING <br /> r <br /> The PM and SSO are responsible for site rec�ordkeeping. Prior to the start <br /> of work, they will review this plan; if there are no .changes to be made, they <br /> will sign the approval form and forward a copy to the DHSM. <br /> All D&M personnel will review the HSP and sign the plan acceptance form in <br /> Attachment A; copies of these forms will be forwarded-` to the DHSM. <br /> The SSO will conduct a Site Safety Briefin& in accordance with Section 12 <br /> i <br /> prior to each shift and have all attendees sign the form in Attachment E; copies <br /> will be forwarded to the DHSM. j } <br /> iI <br /> Any accident or exposure incident will be investigated and the form in <br /> Attachment C will be d completed and forwarded red to the office administrative manager <br /> r• and the DHSM. <br /> All instrument readings and calibrations, PPE use and changes, health and <br /> safety-related issues, and deviations from or problems with this HSP will be <br /> ii. <br /> recorded in the Field Log. These portions of the 'Log will be transmitted to the <br /> DHSM for review at the completion of field operations. <br /> C <br /> t <br /> f <br /> I� <br /> CHEVMERC.H50 35 <br /> J <br />