My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
4040
>
2900 - Site Mitigation Program
>
PR0001963
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2019 11:04:15 AM
Creation date
12/19/2019 10:33:31 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0001963
PE
2950
FACILITY_ID
FA0003965
FACILITY_NAME
PG&E
STREET_NUMBER
4040
STREET_NAME
WEST
STREET_TYPE
LN
City
STOCKTON
Zip
95204
APN
11702001
CURRENT_STATUS
01
SITE_LOCATION
4040 WEST LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
123
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Product thickness is calculated by subtracting the depth to <br /> product from the depth to water. In addition, water <br /> elevations are adjusted for the presence of fuel with the <br /> following calculation: <br /> (Product Thickness) ( .8)+(Water Elevation) <br /> = Corrected Water Elevation <br /> Note: The factor of 0.8 accounts for the density difference <br /> between water and petroleum hydrocarbons. <br /> Newly installed wells will be allowed to stabilize for 24 <br /> hours after development prior to free product inspection. <br /> • An acrylic Surface Sampler will be used for visual <br /> inspection of the groundwater in order to note sheens <br /> (difficult to detect with the Interface Probe) , odors, <br /> microbial action and sediments. The sampler is calibrated <br /> in inches and centimeters for visual inspection of product <br /> thickness. <br /> To reduce the potential for cross contamination between <br /> wells, the monitorings will take place in order from the <br /> least to most contaminated, if known. Wells containing free <br /> product will be monitored last. Between each well <br /> monitoring the equipment will be decontaminated. <br /> Water level data collected from the wells will be used to <br /> develop a groundwater contour map for the project site. <br /> Groundwater flow will be estimated to be perpendicular to <br /> equipotential lines drawn on the map. <br /> 10.0 Well Development Protocol <br /> Groundwater monitoring wells will be surged and developed <br /> prior to setting the surface seal. Approximately 10 times <br /> the volume of water in the casing will be withdrawn if <br /> possible. Casing volumes will be calculated in the <br /> following manner: <br /> Volume of Schedule 40 PVC Pipe <br /> Diameter I.D. Volume <br /> .(inches) ( inches) Gal/linear ft. <br /> ------------------------------------------ <br /> 2 2.067 0.17 <br /> 4 4.026 0.66 <br />
The URL can be used to link to this page
Your browser does not support the video tag.