Laserfiche WebLink
Pacific Gas'&Electric Co, <br /> Page 7 <br /> U Drilling_Spoils: <br /> Auger cuttings from the drilling operation will be°.placed in drums and`retained on-site.The results of chemical <br /> analysis will be used to evaluate the.appropriate disposal-of any,contaminate&auger cuttings by PG&E. <br /> C�1 x <br /> Health and Safety <br /> A site health and safetyplan will.be prepared for the field investigation prior to commencement of the <br /> field investigation.Please refer to the sample project Health and Safety plan'included in Appendix A.This sample . <br /> plan illustrates the issues addressed in Dames&Moore's health and safety plans in accordance wth.40 CFR 1910.120. <br /> 6.0 PROJECT.SCHEDULE. <br /> Dames&'Moore is prepared to begin this study upon receipt of approval of the proposed workplan from the San Joaquin. <br /> County Department of Environmental Health and authorization from.PG&E It is estimated that the proposed scope of <br /> _ services will require approximately four to six weeks to complete. This.schedule is partially dependent on the time <br /> ' <br /> required for agency review,scheduling of drilling equipment;access to the site and site area selected for <br /> drilling,and time required for.specific chemical analysis.:We will arrange our visit to:the site for the field <br /> U portion of the investigation through,the PG&E office. <br /> !.� A summary:report will be prepared at the completion of the field,laboratory,chemical,analyses and office analysis <br /> portions of the investigation.The report would>detail the;finding of the investigation,and would address the <br /> components of the criteria established by the RW.QCB for a problem assessment report,including a preliminary. <br /> f evaluation of appropriate remedial and mitigating alternatives basedupon data obtained from our.limited study. The <br /> t� summary report will be prepared under the auspices and signed b-y Registered Civil Engineer,Environmental <br /> Professionaf or Geologist. <br /> j Proposal <br /> L� Stockton Service Center <br /> i.� - DAMES &MOORE <br />