My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
4040
>
2900 - Site Mitigation Program
>
PR0001963
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2019 11:04:15 AM
Creation date
12/19/2019 10:33:31 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0001963
PE
2950
FACILITY_ID
FA0003965
FACILITY_NAME
PG&E
STREET_NUMBER
4040
STREET_NAME
WEST
STREET_TYPE
LN
City
STOCKTON
Zip
95204
APN
11702001
CURRENT_STATUS
01
SITE_LOCATION
4040 WEST LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
123
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pacific Gas'&Electric Co, <br /> Page 7 <br /> U Drilling_Spoils: <br /> Auger cuttings from the drilling operation will be°.placed in drums and`retained on-site.The results of chemical <br /> analysis will be used to evaluate the.appropriate disposal-of any,contaminate&auger cuttings by PG&E. <br /> C�1 x <br /> Health and Safety <br /> A site health and safetyplan will.be prepared for the field investigation prior to commencement of the <br /> field investigation.Please refer to the sample project Health and Safety plan'included in Appendix A.This sample . <br /> plan illustrates the issues addressed in Dames&Moore's health and safety plans in accordance wth.40 CFR 1910.120. <br /> 6.0 PROJECT.SCHEDULE. <br /> Dames&'Moore is prepared to begin this study upon receipt of approval of the proposed workplan from the San Joaquin. <br /> County Department of Environmental Health and authorization from.PG&E It is estimated that the proposed scope of <br /> _ services will require approximately four to six weeks to complete. This.schedule is partially dependent on the time <br /> ' <br /> required for agency review,scheduling of drilling equipment;access to the site and site area selected for <br /> drilling,and time required for.specific chemical analysis.:We will arrange our visit to:the site for the field <br /> U portion of the investigation through,the PG&E office. <br /> !.� A summary:report will be prepared at the completion of the field,laboratory,chemical,analyses and office analysis <br /> portions of the investigation.The report would>detail the;finding of the investigation,and would address the <br /> components of the criteria established by the RW.QCB for a problem assessment report,including a preliminary. <br /> f evaluation of appropriate remedial and mitigating alternatives basedupon data obtained from our.limited study. The <br /> t� summary report will be prepared under the auspices and signed b-y Registered Civil Engineer,Environmental <br /> Professionaf or Geologist. <br /> j Proposal <br /> L� Stockton Service Center <br /> i.� - DAMES &MOORE <br />
The URL can be used to link to this page
Your browser does not support the video tag.