Laserfiche WebLink
i <br /> DEL-TECH GEOTECHNICAL SUPPORT SERVICES <br /> MONITORING WELL FIELD LOG 2003 <br /> i <br /> SAMPLE LOCATION I MW 48 DATE: 6/23/2003 <br /> PROJECT NAME CONNELL MOTORS ANALYSIS PERFORMED SEE CHAIN OF CUSTODY <br /> ADDRESS 2211 N WILSON WAY SAMPLE TIME 8 30 <br /> CITY,STATE STOCKTOK CA SAMPLE CONTAINERS 4 V O A'S <br /> SITE CONTACT NONE PRESERVATIVES HCL <br /> CONSULTANT FOOTHILL ENG LAB ANALYSIS BY SHERWOOD LABS <br /> PROJECT MANAGER IRV MONUMENT FLUSH <br /> SAMPLER DEL-TECH WELL CASING MATERIAL PVC <br /> SIGNED WELL CASING DIA 2" / 0 1632 <br /> SAMPLE MEDIA GROUNDWATER P I D READING 1 ODOR N/A NONE <br /> TOP OF CASING ELEV TION MSL COLOR BROWN <br /> DEPTH TO WATER (feet.100th's) 5159 FEET CALC PURGE VOL 140 �GAL <br /> AL <br /> DEPTH OF WELL (feet 100th's) 60 22 FEET TOTAL VOLUME PURGED 4 5 STANDING WATER COLUMN 863 FEET DEPTH OF PUMP NIA EET <br /> FIELD PARAMETERS <br /> TIME CUMULATIVE DRAW PUMPING pH E C TEMP ORP I DISSOLVED TURBIDITY <br /> CASING VOLUME DOWN RATE OXYGEN COLOR <br /> PER PURGE (DTW) (GPM(LPM) (units) (UMHOS) (Ce Aus) (Mvolts) (PPM) (N T U) <br /> 0 N/A 5 GPM 777 1112 209 1978 189 BROWN <br /> 15 774 1114 209 1979 193 " <br /> 3 " 774 1122 209 1958 163 " <br /> 45 774 1129 21 1955 169 " <br /> PURGE METHOD DEDICATED WATERRA PUMP <br /> SAMPLE METHOD DEDICATED WATERRA PUMP <br /> D T W AFTER PURGE D T W AT SAMPLE TIME 5410 <br /> WELL INTEGRITY CAP&SEAL ARE SECURE LOCK INSTALLED <br /> WELL LOCATION SEE SITE MAP <br /> REMARKS <br /> WEATHER CLEAR SKIES WIND NW5 <br /> QUALITY CONTROL ALL PURGING EQUIPMENTAND SAMPLING EQ UIPMENT WAS CLEANED IN THE <br /> FIELD WITH A STEAMCLEANER&ALCONOX SOAP NEW NITRILE GLOVES <br /> CONTAINMENT D O T 17 55 GAL.STEEL DRUM OR 60 GAL.POLY DRUM <br /> INSTRUMENTATION Y S I 556 MUTIPROBE SYSTEM Y S I DISSOLVED OXYGEN METER <br /> SOLINIS T SLOPE METER THERMODINE 580B P I D <br /> KECK INTERFACE MSTER TURBIDITY METER <br /> #OF DRUMS ON SIGHT WATER SOIL <br />