Laserfiche WebLink
FOOTHILL ENGINEERING LOG OF BORING MW 10 <br /> CIVIL ENGINEERS <br /> LODI CA (Page 1 of 2) <br /> CONNELL MOTOR TRUCK Date Started I=0103 Company Rep E R <br /> Site Investigation Date Completed 1M303 Northing C=d <br /> STOCKTON,CA Hole Diameter V. Eashng Coord <br /> Project#2083 Drilling Method AUGER Survey By <br /> Sampling Method SPLIT SPOON Logged By ER <br /> Well MW#10 <br /> c Surf 2 o c Elev <br /> Elev co DESCRIPTION 43 co o %r <br /> C7 U) m O Sieve <br /> 0 <br /> - egg,&ROVER5- <br /> 10- <br /> 15- <br /> 20- <br /> 25- <br /> 30— <br /> 1D15242530 �'bAWC <br /> 35 <br /> 44 SANDYCLAYSILT 0 <br /> ML <br /> 45— SILTY CLAY <br /> CL <br /> 50— SANDY CLAY, D <br /> CL <br /> 55- <br /> - SILTY CLAY, <br /> 6L CL <br /> J60 <br />