Laserfiche WebLink
• DEL-TECH GEOTECHNICAL SUPPORT SERVICES <br /> MONITORING WELL FIELD LOG 2002 <br /> SAMPLE LOCATION/MW - 3 DATE: 9/10/2002 <br /> PROJECT NAME CONNELL MOTORS ANALYSIS PERFORMED SEE CHAIN OF CUSTODY <br /> ADDRESS 2211 N WILSON WAY SAMPLE TIME 1530 <br /> CITY,STATE STOCKTON, CA SAMPLE CONTAINERS 4 V O A'S <br /> SITE CONTACT NONE PRESERVATIVES HCL <br /> CONSULTANT FOOTHILL ENG LAB ANALYSIS BY SHERWOOD LABS <br /> PROJECT MANAGER IRV MONUMENT FLUSH <br /> SAMPLER I DEL-TECH WELL CASING MATERIAL PVC <br /> SIGNED WELL CASING DIA 2" / 0 1632 <br /> SAMPLE MEDI GROUNDWATER P I D READING 1 ODOR NIA FUEL <br /> TOP OF CASING ELI ATION MSL COLOR LIGHT GREY <br /> DEPTH TO WATER feet 100th's 5739 FEET CALC PURGE VOL 043 GAL <br /> DEPTH OF WELL feet 100th's 60 02 FEET TOTAL VOLUME PURGED 15 GAL <br /> STANDING WATER COLUMN 263 FEET DEPTH OF PUMP NIA FEET <br /> FIELD PARAMETERS <br /> • TIME CUMULATIVE DRAW PUMPING pH E C. TEMP. ORP DISSOLVED TURBIDITY <br /> CASING VOLUME DOWN RATE OXYGEN COLOR <br /> PER PURGE (DT W) (GPM/LPM) (units) (UMHOS) (Celsius) (Mvolts) (PPM) (N T U) <br /> 0 NIA 5 GPM 712 1207 23 8 -1025 017 LT GREY <br /> 05 704 1193 222 -111 023 " <br /> I r1l6 98 1 190 22 -118 020 " <br /> 1 5 It it689 1178 218 -132 021 " <br /> PURGE METHOD DEDICATED WATERRA PUMP <br /> SAMPLE METHOD DEDICATED WATERRA PUMP <br /> D T W AFTER PURGE D T W AT SAMPLE TIME 58 51' <br /> WELL INTEGRITY CAP&SEAL ARE SECURE LOCK INSTALLED <br /> WELL LOCATION SEE SITE MAP <br /> REMARKS <br /> WEATHER CLEAR SKIES WIND NW5 <br /> UALITY CONTROL ALL PURGING EQUIPMENT AND SAMPLING EQUIPMENT WAS CLEANED IN THE <br /> FIELD WITH.4 STEAMCLEANER&ALCONOX SOAP NEW NITRILE GLOVES <br /> CONTAINMENT D O T 17 55 GAL STEEL DR UM OR 60 GAL POLY DR UM <br /> INSTRUMENTATION Y S 1 556 MUTIPROBE SYSTEM Y S I DISSOLVED OXYGEN METER <br /> SOLINIST SLOPE METER THERMODINE 580B P I D <br /> . KECK INTERFACE METER TURBIDITY METER <br /> #OF DRUMS ON SIGHT. WATER SOIL <br />