Laserfiche WebLink
DEL-TECH GEOTECHNICAL SUPPORT SERVICES <br /> MONITORING WELL FIELD LOG 2001 <br /> SAMPLE LOCATION /MW— GD DATE: 12/13/2001 <br /> PROJECT NAME CONNELL MOTORS ANALYSIS PERFORMED SEE CHAIN OF CUSTODY <br /> ADDRESS 2211 N WILSON WAY SAMPLE TIME toil <br /> CITY STATE STOCKTON,CA SAMPLE CONTAINERS 2 V O A'S <br /> SITE CONTACT NONE PRESERVATIVES HCL <br /> CONSULTANT FOOTHILL ENG LAB ANALYSIS BY SHERWOOD LABS <br /> PROJECT MANAGER IRV MONUMENT FLUSH <br /> SAMPLER DEL-TECH WELL CASING MATERIAL PVC <br /> SIGNED + WELL CASING DIA . 2" / 01632 <br /> SAMPLE MED GROUNDWATER P I D READING/ODOR NIA NONE <br /> TOP OF CASING ELEVATION MSL COLOR GREY <br /> DEPTH TO WATER feet 100ths) 4883 FEET CALC.PURGE VOL 805 GAL <br /> DEPTH OF WELL feet 100ths) 98 14 FEET TOTAL VOLUME PURGED 24 GAL <br /> STANDING WATER COLUMN 4931 FEET I DEPTH OF PUMP- NIA FEET <br /> • FIELD PARAMETERS <br /> TIME CUMULATIVE DRAW PUMPING pH E C TEMP O.R P DISSOLVED TURBIDITY <br /> CASING VOLUME DOWN RATE OXYGEN COLOR <br /> PER PURGE (DTW) (GPMILPM) (units) (UMHOS) (Celsius) (Mvolts) (PPM) (N T U) <br /> 0 NIA 5 GPM 741 650 205 -13 NIA GREY <br /> 8 tf to728 654 208 —9 " <br /> 16 DRY it7 50 666 20 7 —46 " <br /> 24 " " 739 657 208 —66 it " <br /> PURGE METHOD DEDICATED WATERRA PUMP <br /> SAMPLE METHOD DEDICATED WATERRA PUMP <br /> D T W AFTER PURGE D T W AT SAMPLE TIME 5419' <br /> WELL INTEGRITY CAP&SEAL ARE SECURE LOCK INSTALLED <br /> WELL LOCATION SEE.SITE MAP <br /> REMARKS FAIR RECHARGE <br /> WEATHER OVERCAST SKIES WIND NW5 <br /> QUALITY CONTROL ALL PURGING EQUIPMENT AND SAMPLING EQUIPMENT WAS CLEANED IN THE <br /> FIELD WITH STEAMCLEANER&ALCONOX SOAP NEW NITRILE GLOVES <br /> CONTAINMENT D O T 17 55 GAL STEEL DRUM OR 60 GAL POLY DR UM <br /> INSTRUMENTATION Y S 1 3560 FLOWCELL Y S I DISSOLVLD OXYGEN METER <br /> SOLINIST SLOPE METER THERMODINE 580B P 1 D <br /> KECK INTERFACE METER TURBIDITY METER <br /> #OF DRUMS ON SIGHT WATER SOIL <br />