Laserfiche WebLink
' detected in water samples collected from boring P32 at 100 feet bsg,at concentrations of 440 <br /> • and 140 gg/l, respectively. <br /> ' TPH-d was detected in water samples collected from boring P32 at 60 and 100 feet bsg, at <br /> concentrations of 230 and 330 µg/1, respectively. <br /> ' TPH-g and TPH-ss were detected in water samples collected from boring P33 at 80 feet bsg, <br /> at concentrations of 680 and 210 µg/1,respectively. TPH-d was detected in the same water <br /> sample collected from boring P33 at a concentration of 230 µg/1. <br /> ' BTEX compounds were detected in the ground water samples at concentrations as high as <br /> 760 gg/1(P32-60,xylene). Benzene was detected in the ground water sample from P32-60 <br /> at a concentration of 96 µg/1 . <br /> • 1,2-DCE was detected at a concentration of 1.4 µg/1 in the water sample collected from P30 <br /> at a depth of 100 feet bsg and 1,2-DCA was detected at a concentration of 25 µg/1 in the grab <br /> ' ground sample collected from P33 at approximately 80 feet bsg. <br /> • No other petroleum hydrocarbon constituents or fuel oxygenated compounds were detected <br /> ' by the laboratory analyses. <br /> • Limited analytical results of the soil samples are depicted on cross section C-C'(Figure 3). <br /> This interpretive cross section has been re-drawn with greater weight given soil classification <br /> from hand samples and with interpretation of CPT data utilized for un-sampled or less <br /> sampled intervals. <br /> • Analytical results from soil samples are summarized in Tables IA, 1B and 1C. <br /> • Analytical results of the grab ground water samples are depicted In Table 2A. <br /> January 2001 - Installation of Ground Water Monitoring Wells. <br /> On 24 through 26 January 2001, seven soil borings were established for the collection of soil <br /> samples and installation of ground water monitoring wells.Fourteen soil samples collected from the <br /> ' monitoring well pilot soil borings were analyzed for TPH-g, TPH-d, BTEX, and fuel additives <br /> including MTBE and HVOCs; petroleum hydrocarbons and HVOC's were not detected in the soil <br /> ' samples. <br /> Analytical results from soil samples are summarized in Tables IA, 1B and 1C; limited analytical <br /> results of the soil samples are depicted on cross section C-C'(Figure 3).The well construction details <br /> are summarized in Table 3. <br /> February 2001 - Sampling of Monitoring Wells. <br /> ' The initial monitoring and sampling of wells MW-1 through MW-7 occurred on 05 February 2001; <br /> • the initial findings indicate: <br /> Advanced GeoEnvironmental,Inc. <br />