Laserfiche WebLink
Thomas M. Oau -2- <br /> COMMENTS ON DEVELOPMENTS <br /> SA-95-04 <br /> 3 . The Traffic Impact Mitigation Fee will be required for this <br /> development . The fee is due and payable at the time of <br /> building permit application. (The fee currently is $197 . 91 <br /> per additional daily trip-end generated in the Stockton area. <br /> The fee shall be automatically adjusted July 1 of each year by <br /> the Engineering Construction Cost Index as published by the <br /> Engineering News Record. A credit for the previous use will <br /> be allowed if it can be verified it has been in operation <br /> within the last two years . ) <br /> (Resolutions R-90-304 , R-91-1025, R-93-167 and R-94-174) <br /> 4 . The Water Supply Facilities Impact Mitigation Fee will be <br /> required for this development . The fee is due and payable <br /> prior to issuance of the building permit . The fee currently <br /> is $116 per 1, 000 gross square foot of additional building as <br /> Manufacturing. The fee shall be automatically increased on <br /> January 1 of each year through the year 2005 at the rate of <br /> 7 . 66 percent . <br /> (Development Title Section 9-818 .4 and Resolution R-91-327) <br /> TMI :RH: lt <br /> PS-SD265.C2 <br /> c : Manuel Lopez, Deputy Director/Development <br />