My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0012580 (2)
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WAVERLY
>
8500
>
2600 - Land Use Program
>
QX-91-0006
>
SU0012580 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/20/2019 9:18:14 AM
Creation date
12/20/2019 9:12:03 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0012580
PE
2656
FACILITY_NAME
QX-91-0006
STREET_NUMBER
8500
Direction
N
STREET_NAME
WAVERLY
STREET_TYPE
RD
City
LINDEN
Zip
95236-
APN
09345001, 09345005
ENTERED_DATE
10/2/2019 12:00:00 AM
SITE_LOCATION
8500 N WAVERLY RD
RECEIVED_DATE
9/30/2019 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
TSok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
QX-91-0006 (RAA) Project - 2 - 18 October 2019 <br /> San Joaquin County <br /> of Administrative Law (OAL) and in some cases, the United States Environmental <br /> Protection Agency (USEPA). Basin Plan amendments only become effective after <br /> they have been approved by the OAL and in some cases, the USEPA. Every three <br /> (3) years, a review of the Basin Plan is completed that assesses the <br /> appropriateness of existing standards and evaluates and prioritizes Basin Planning <br /> issues. For more information on the Water Quality Control Plan for the Sacramento <br /> and San Joaquin River Basins, please visit our website: <br /> hftp://www.waterboards.ca.gov/centralvalley/Water issues/basin plans/ <br /> Antidegradation Considerations <br /> All wastewater discharges must comply with the Antidegradation Policy (State <br /> Water Board Resolution 68-16) and the Antidegradation Implementation Policy <br /> contained in the Basin Plan. The Antidegradation Implementation Policy is <br /> available on page 74 at: <br /> https://www.waterboards.ca..qov/centraIvaIleV/water issues/basin plans/sacsir 201 <br /> 805.pdf <br /> In part it states: <br /> Any discharge of waste to high quality waters must apply best practicable <br /> treatment or control not only to prevent a condition of pollution or nuisance from <br /> occurring, but also to maintain the highest water quality possible consistent with <br /> the maximum benefit to the people of the State. <br /> This information must be presented as an analysis of the impacts and potential <br /> impacts of the discharge on water quality, as measured by background <br /> concentrations and applicable water quality objectives. <br /> The antidegradation analysis is a mandatory element in the National Pollutant <br /> Discharge Elimination System and land discharge Waste Discharge Requirements <br /> (WDRs) permitting processes. The environmental review document should <br /> evaluate potential impacts to both surface and groundwater quality. <br /> II. Permitting Requirements <br /> Construction Storm Water General Permit <br /> Dischargers whose project disturb one or more acres of soil or where projects <br /> disturb less than one acre but are part of a larger common plan of development that <br /> in total disturbs one or more acres, are required to obtain coverage under the <br /> General Permit for Storm Water Discharges Associated with Construction Activities <br /> (Construction General Permit), Construction General Permit Order No. 2009-009- <br /> DWQ. Construction activity subject to this permit includes clearing, grading, <br /> grubbing, disturbances to the ground, such as stockpiling, or excavation, but does <br /> not include regular maintenance activities performed to restore the original line, <br /> grade, or capacity of the facility. The Construction General Permit requires the <br /> development and implementation of a Storm Water Pollution Prevention Plan <br /> (SWPPP). For more information on the Construction General Permit, visit the State <br /> Water Resources Control Board website at: <br /> http://www.waterboards.ca.gov/water issues/prog rams/stormwater/constperm its.sht <br /> MI <br />
The URL can be used to link to this page
Your browser does not support the video tag.