My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
4040
>
2300 - Underground Storage Tank Program
>
PR0231963
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/23/2019 2:45:45 PM
Creation date
12/23/2019 2:27:42 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0231963
PE
2361
FACILITY_ID
FA0006445
FACILITY_NAME
PG&E: Stockton Service Center
STREET_NUMBER
4040
STREET_NAME
WEST
STREET_TYPE
Ln
City
Stockton
Zip
95204
APN
117-020-01
CURRENT_STATUS
01
SITE_LOCATION
4040 West Ln
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INTRODUCTION <br /> The purpose of this Health and Safety Plan (HASP) is to define on-site health and safety <br /> roles , health and safety procedures , and discuss chemical and physical hazards , and <br /> electrical safety issues which may be encountered at the project . <br /> The elements of the HASP include procedures for personnel protection equipment safety , <br /> medical surveillance, air quality monitoring, and general safe work practices . This plan <br /> also details the proper emergency procedures , including emergency response and first-aid <br /> capabilities . Compliance with this HASP is required of all workers and third parties who <br /> enter the sites while the above work is in progress . <br /> Tait clients may suggest or require adherence to their company HASP . Tait employees <br /> shall adhere to the more stringent procedures in either case or the required procedures by <br /> Cal/OSHA or other Federal mandated safety orders . <br /> SCOPE OF WORK <br /> Saw cut and remove existing waste oil spill bucket. <br /> Install new EDGE 1 , 5 Gallon single walled spill bucket and straight drop tube <br /> ENVIRONMENTAL PROTECTION PLAN <br /> It is important to protect the surrounding environment as it exists around the work area <br /> involved . All trees , plants , and shrubs close to the work area will be barricaded if <br /> necessary to reduce the risk of damage from construction debris and equipment. All <br /> efforts will be made to insure protection of natural resources within the boundaries of the <br /> project and within the work area . All demolition will be limited to the designated work <br /> area. <br /> Dust control measures , in the form of water spray , will be used to prevent dust migration <br /> from the excavation site . This is a generally accepted procedure by all Governing <br /> Agencies . <br /> Generated hazardous waste will be handled and disposed of in Compliance with the <br /> following; 40 CFR 260 , 40 CFR 261 , 40 CFR 262 , 40 CFR 263 , CFR 1910 , Title 22 <br /> Division 4 , Title 23 , Cal OSHA , and Cal Haz-Mat Enforcement and Liability . <br /> HEALTH AND SAFETY PERSONNEL <br /> INTRODUCTION <br /> The following sections briefly describe the Health and Safety Personnel, and general <br /> responsibilities , which will be employed during the project. <br />
The URL can be used to link to this page
Your browser does not support the video tag.