My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
4040
>
2300 - Underground Storage Tank Program
>
PR0231963
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/23/2019 2:45:45 PM
Creation date
12/23/2019 2:27:42 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0231963
PE
2361
FACILITY_ID
FA0006445
FACILITY_NAME
PG&E: Stockton Service Center
STREET_NUMBER
4040
STREET_NAME
WEST
STREET_TYPE
Ln
City
Stockton
Zip
95204
APN
117-020-01
CURRENT_STATUS
01
SITE_LOCATION
4040 West Ln
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SA N ` } { O A Q {UI IN <br /> Environmental Health Department <br /> _ ., C 0 UN it"NY ._ .._._. . <br /> UST SYSTEM RETROFIT OR REPAIR <br /> (Submit minimum of 3 sets of plans & applications as originals will be retained by EHD ) <br /> 1 . Site map enclosed ? YES [Xj NO [ ] <br /> 2 , Submit copies of ICC Service Technician and/or Installer' s certificate and all manufacturer training <br /> certificates for each person installing or testing any component that is repaired or replaced , Ensure a copy of <br /> the " Site Health and Safety Pian " is available on the jobsite as required by Title 8 . <br /> 3 . Detailed description of work to be completed . List components to be repaired or replaced and attach a <br /> diagram drawn to scale showing location of repairs and/or replacements . if repairing a component , describe <br /> how this will be done . ( If addin piping , UDC' s , or other UST equipment, or performing tank top upgrade , <br /> use the UST installation Application pages 4 -8 as necessary for a timely plan review) : <br /> Saw cut and remove existing waste oil spill bucket, <br /> Install New OPW Edgel , 5 Gallon single walled spill bucket and straight drop tube. j <br /> 4 , List of equipment to be used (Attach manufacturer' s specification sheets showing third"party approval ) : <br /> OPW Edge 1 , Single walled Spill Container <br /> OPW 61T Drop Tube <br /> 54 Decontamination Procedures : <br /> a . Will piping be decontaminated prior to removal ? YES [ ] NO [ <br /> b . Identify contractor performing decontamination : <br /> Name Phone ( ) <br /> Address City Zip <br /> 3of6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.