Laserfiche WebLink
CONDITIONS OF APPROVAL <br /> PA-'190026'1 <br /> SMS BRINERS, INC./STRATEGIC LAND PLANNING <br /> Uses Permit Application No. PA-'190026'1 was approved by the Planning Commission on June 18,2020. <br /> The effective data of approval is June 28,2020. This approval will expire on December 28,202'1,which <br /> is oig hteen (18)months from the effective tlate of approval,unless(f)all Conditions of Approval have <br /> been complied with, (2) all necessary building permits have been Issued and remain in force, and (3) <br /> all necessary permits from other ag¢ncies have bean issued and remain In force. <br /> Unless otherwise specified, all Contlitions of Approval and ordinance requirements shall ba fulfilled <br /> prior to the establishment of the use and the issuance of any building permits. Those Conditions <br /> follow¢d by a Section Number have bean Itlentiflad as ortllnanca requirements pertinent to this <br /> application. Ordinance requirements cannot ba motllfiad, and other ordinance requirements may <br /> apply. <br /> 1. COMMUNITY DEVELOPMENT DEPARTMENT[Contact: [209]466-3'121) <br /> a. BUILDING PERMIT: Submit an"APPLICATION-COMMERCIAL BUILDING PERMIT'. The Site Plan- <br /> required as a part of the building permit must be prepared by a registered civil engineer or licensed <br /> architect. This Plan must show drainage, driveway access details including gates, on-site parking, <br /> lantlscaping, signs, existing and proposed utility services, and gratling (refer to the "SITE PLAN <br /> CHECK LIST'for details). Foundation and soils investigation shall be conducted in conformance with <br /> Chapter 18 of the California Building Code at the time of permit application. A fee is required for the <br /> Site Plan review. (Development Titia Section 9-BB4) <br /> b. APPROVED USE: This approval is for the expansion of a brining antl pickling facility in two (2) <br /> phases over six(6) years. (Use Type:Agricultural Processing —Food Processing) <br /> 1. Phase 1 -Includes the following: <br /> Construction of a 58,000-square-foot warehouse addition with a 600 kW roof mounted solar <br /> system <br /> 2. Phase 2-Includes the following: <br /> Construction of an 8,000-square-foot non-refrigerated bulk goods storage <br /> Construction of a 1,500-square-foot shop addition <br /> Construction of a 3,000-square foot raw materials cooler <br /> c. CAPITAL FACILITY FEE: This project may be subject to the Capital Facility Fee. If the Capital Facility <br /> Fee is applicable, the County shall collect the fees before the issuance of any building permits. <br /> (Development Title Section 9-1245.2) <br /> d. BUILDING PERMIT: The owner shall obtain a building Permit for existing buildings labelatl as <br /> "Existing Structure 6" and "Existing Structure 8" on the Revised Site Plan dated December 2, 2019, <br /> prior to issuance of any building permits for Phases 1 and Phases 2. <br /> e. PARKING: Off-street parking shall be provided and comply with the following: <br /> 1. All parking spaces, driveways, and maneuvering areas shall be surfaced and permanently <br /> maintained with base material of appropriate depth and asphalt concrete or Portland cement <br /> concrete to provide a durable, dust free surface. Bumper guards shall be provided when <br /> necessary to protect adjacent structures or properties. (Development Title Section 9-1015.5[e]) <br /> PA-1900261 —Conditions of Approval 1 <br />