My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0012713
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
4 (STATE ROUTE 4)
>
18350
>
2600 - Land Use Program
>
PA-1900261
>
SU0012713
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2024 9:09:40 AM
Creation date
12/26/2019 2:01:42 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0012713
PE
2626
FACILITY_NAME
PA-1900261
STREET_NUMBER
18350
Direction
E
STREET_NAME
STATE ROUTE 4
City
STOCKTON
Zip
95215-
APN
18314010
ENTERED_DATE
12/24/2019 12:00:00 AM
SITE_LOCATION
18350 E HWY 4
RECEIVED_DATE
12/23/2019 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
TSok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
136
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Plen Review Teem PGFPIanRevlev�emm <br /> .Pacific Gas acrd ane manasmne�� <br /> Elecfric Company' sn�'�o�cn��Roetl33]OA <br /> December 30, 2019 <br /> Taddie Hernandez <br /> San Joaquin County <br /> 181 O E. Hazelton Ave. <br /> Stockton, CA 95205 <br /> Ref: Gas and Electric Transmission and Distribution <br /> Dear Mr. Hernandez, <br /> Thank you for submitting '18350 East State Route 4 Highway-PA-'190026'1 plans for our review. <br /> PGS.E will review the submitted plans in relationship to any existing Gas and Electric facilities <br /> within the project area. If the proposed project Is adjacent/or within PG&E owned property <br /> and/or easements, we will be working with you to ensure compatible uses and activities near <br /> our Facilities. <br /> Attached you will find information and requirements as it relates to Gas facilities (Attachment 1) <br /> and Electric facilities(Attachment 2). Please review these in tletail, as it is critical to ensure <br /> your safety and to protect PG&E's facilities and its existing rights. <br /> Below is additional Information for your review: <br /> 1. This plan review process does not replace the application process For PGBE gas or <br /> electric service your project may require. For these requests, please continua to work <br /> with PG8.E Service Planning: Fitt �//www / US/b / /buildi c- <br /> d- t" / 'ew/overview Daae. <br /> 2. If the project being submitted is part of a larger project, please Include the entire scope <br /> of your project, and not just a portion of it. PGS.E's facilities era to be incorporated within <br /> any CEQA document. PGB.E needs to verify that the CEQA document will identify any <br /> required future PGSoE services. <br /> 3. An engineering deposit may be required to review plans For a project depending on the <br /> size, scope, and location of the project and as it relates to any rearrangement or new <br /> installation of PGS.E facilities. <br /> Any proposed uses within the PG8.E fee strip and/or easement, may include a California Public <br /> Utility Commission (CPUC) Section 851 filing. This requires the CPUC to render approval for a <br /> conveyance of rights for specific uses on PG&E's fee strip or easement. PGB.E will advise if the <br /> necessity to incorporate a CPUC Section 85'l filing is required. <br /> This letter does not constitute PGS.E's consent to use any portion of its easement for any <br /> purpose not previously conveyed. PGBE will provide a project specific response as required. <br /> Sincerely, <br /> Plan Review Team <br /> Land Management <br /> PGBcE Gas and Electric Facilities Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.