Laserfiche WebLink
�[lct i23 02 02: 42p 209-545-3533 p.".�'` <br /> John Paoluccio Consulting Engineers, Inc. (JPCE) <br /> PO Box 1316/5038 Salida Blvd.,Salida, California 95368 <br /> Ph 209.545.1661 Fax 209.5453533 c-mail info@JPCE.com web JPCE.com I �, r r,t�jil <br /> October 23,2002 <br /> , 3 2002 <br /> Environmental Health Department- San Joaquin County OCT 2 <br /> 304 East Weber Avenue,Third Floor, Stockton, CA 95202-2708 E'ilVl �.)(`:�',''tf <br /> Attn: Donna K. Heran R.E.H.S. Director Ph 209-468-3420 Fax 209-464-0138 PE-RV11 I./St: rS <br /> Copy to: Building Department—SJC Community Development Fax: 209-468-3163 <br /> F&H Construction Attn: Clark Fregien, President Fax: 209-931-4427 <br /> Kruger Foods,Inc. (KFI). Attn: Hans Kruger Fax: 510-782-8130 <br /> Project: Kruger Foods, Inc. (KFI) <br /> Permit Number: BP-0200350 Parcel 183-140-08 <br /> Subject: Code and Environmental Concerns <br /> John Paoluccio Consulting Engineers, Inc.(JPCE) shall not be responsible for any code, <br /> safety, mechanical or environmental problems that may be associated with the above project. <br /> Our firm,(JPCE)was engaged to provide certain mechanical engineering services as directed <br /> by F&H Construction on the KFI project, already under construction, during late June <br /> through July 18,2002,when F&H stopped our services. <br /> F&H Construction listed our firm on the Project Schedule underBuildin Desi /Permits. <br /> Activity ID 260 Design Flow Process as the responsible party We are concerned that our firm, <br /> name or reputation may he used by F&I-1 in a manner that may influence the approval of certain <br /> code or environmental items. Our firm shall not be used in any way related to obtaining permits <br /> or approvals and JPCE shall be removed from the Project Schedule. <br /> During the course of our work we became aware of various potential improvements, <br /> deficiencies, problems and environmental concerns with the proposed design and direction <br /> given to us by F&H. We advised F&H of alternate designs for various items to avoid costh, <br /> and future problems for KFI before we were directed to stop work. <br /> Please be advised that we did not complete our engineering work or drawings for <br /> construction before our services were stopped. We did not prepare drawings on the brine <br /> Piping systems as we had certain environmental concerns that were not resolved with F&H. <br /> F&H listed JPCE as the responsible party on Design/Permit Schedule and since my services <br /> were stopped before we had a chance to help resolve certain items, I felt it was my <br /> professional duty to inform F&H, KFI, and the Building and Environmental Department on <br /> this matter in order to protect our firm and to avoid future problems. <br /> Please note that JPCE has filed a complaint against F&H with the Contractors State License <br /> Board. This involves a dispute over compensation and our agreement. <br /> Sincerely, <br /> . ohn A. Paoluccio PE <br /> o2 mg. P/�otallro a(o vo ped/dA� Ab*AA i¢avuGvikAwt P,0)A <br /> 8mr r'MEy Aitb kSrNb AS D6tGw �Ntrr��rli �,�,y <br /> S (� b C) <br />