Laserfiche WebLink
Oct e?3 02 02: 42p 209-545-3533p.�:'" <br /> Job" Paoluccio Consulting Engineers, Inc. (JPCE) <br /> PO Box 1316/5038 Salida Blvd., Salida, California 95368 <br /> Ph 209.545.1661 Fax 209.545.3533 e-mail info@.fPCE.com web JPCE.cI}oml-, <br /> October 23,2002 <br /> 3 2002 <br /> Environmental Health Department- San Joaquin County OCT 2 <br /> 304 East Weber Avenue,Third Floor, Stockton, CA 95202-2708 �i:j��j�1�.)(�',i, tPd E,LTH <br /> Attn: Donna K. Heran R.E.H.S. Director Ph 209-468-3420 Fax 209464-0138 <br /> Copy to: Building Department—SJC Community Development Fax: 209-468-3163 <br /> F&H Construction Attn: Clark Fregien, President Fax: 209-931-4427 <br /> Kruger Foods, Inc. (KFI). Attn: Hans Kruger Fax: 510-782-8130 <br /> Project: Kruger Foods, Inc. (KFI) <br /> Permit Number: BP-0200350 Parcel 183-140-08 <br /> Subject: Code and Environmental Concerns <br /> John Paoluccio Consulting Engineers, Inc.(JPCE) shall not be responsible for any code, <br /> safety, mechanical or environmental problems that may be associated with the above project. <br /> Our firm,(JPCE)was engaged to provide certain mechanical engineering services as directed <br /> by F&H Construction on the KFI project,already under construction, during late June <br /> through July 18,2002,when F&H stopped our services. <br /> F&H Construction listed our firm on the Project Schedule under Buildin Desi /Permits. <br /> Activity ID 260 Desien Flow Process as the responsible party. We are concerned that our firm, <br /> name or reputation may he used by F&I-1 in a manner that may influence the approval of certain <br /> code or environmental items. Our firm shall not be used in any way related to obtaining permits <br /> or approvals and JPCE shall be removed from the Project Schedule. <br /> During the course of our work we became aware of various potential improvements, <br /> deficiencies, problems and environmental concerns with the proposed design and direction <br /> given to us by F&H. We advised F&H of alternate designs for various Items to avoid costo' <br /> and future problems for KFI before we were directed to stop work. <br /> Please be advised that we did not complete our engineering work or drawings for <br /> construction before our services were stopped. We did not prepare drawings on the brine <br /> piping systems as we had certain environmental concerns that were not resolved with F&H. <br /> F&H listed JPCE as the responsible party on Design/Permit Schedule and since my services <br /> were stopped before we had a chance to help resolve certain items,I felt it was my <br /> professional duty to inform F&H, KFI, and the Building and Environmental Department on <br /> this matter in order to protect our fum and to avoid future problems. <br /> Please note that JPCE has filed a complaint against F&H with the Contractors State License <br /> Board. This involves a dispute over compensation and our agreement. <br /> Sincerely, <br /> . ohinn A. Paoluccio"PE <br /> o2 MR. P401"fero a(D 400 Gexldov Aa,6AK �fop 06Vdkd•o7 P9lA <br /> /31tT ?'NFy ftR6 K4tRJG H15rVtjIN6 AS PEt,Gg, ON6i,0400el <br /> S (� b Q3� Slog <br />