Laserfiche WebLink
HORNER RZY CHEZ; PRECISION LINE TEST WORKSHEET <br /> OWNER/OPERATOR S-TA2 �� '� �I5rSITE AGENT C, <br /> ADDRESS l�3Z ��.�'.fl�- TELEPHONE 9�3 ¢6 <br /> LINE CONNECTED TO TANK# / N INE HAS PLD 'ES 0 SUCTI01"i LINA <br /> 96zloss <br /> LINE DISPENSES �1��-- ' `,`�L' APPROXIMATE LINE LENGTH .3100 I EET <br /> TURBINE MAKE �E.fJ�Cl�is�' DISPENSER 0/ MAKE 24�1 '4O <br /> TANK TEST EQUIPMENT TO BE IN PLACE DURING LINE TEST i'ES NO <br /> LINE TO BE TESTED WITH LINE BLOCK IN PLACE OF PLLD YE ir0 <br /> TURBINE OUTPUT PRESSURE PSI TEST PRESSURE TO BE I <br /> TEST PRESSURE APPLIED AT HOURS IMMEDIATE LINE DROP ()E /S"-L(NFS <br /> TIME LINE SRT LINE END X .0037 RESULTS EST GPH MONITOR ACCU?NI, G.PH TEST <br /> 104y / 0(11/ a <br /> lass <br /> 411 6 / A:5 <br /> 1140 <br /> LINE INCREASE WHEN PRESSURE REMOVED /3 TOTAL GPH <br /> BASED UPON CURRENT STANDARDS THE GPH DATA AS SHOWN ALLOW RONG, IV" <br /> THE LINE TO BE CONSIDERED TIGHT. <br /> TECHNICIAN LICENSE NUMBER TEST DATE <br /> INTEGRITY TANK TESTING SERVICES P.O. BOX 691376 STOCKTON, CALIFORNIA 95269 <br /> (209) 474-1375 (800) 262-8378 <br />