Laserfiche WebLink
HORNER EZY CHEK PRECISION LINE TEST WORKSHEET <br /> OWNER/OPERATOR 57*"� a/ Sc'y-A '<—TE AGENT <br /> ADDRESS–/4'3'7– TELEPHONE <br /> LINE CONNECTED TO TANK# Z s INE HAS PLLD YES NO SUCTION"+ LINa <br /> LINE DISPENSES <br /> APPROXIMATE LINE LENGTH <br /> TURBINE MASE DISPENSER #/ MAKE-__ <br /> TANK TEST EQUIPMENT TO BE IN PLACE DURING LINE TEST NO <br /> LINE TO BE TESTED WITH LINE BLOCK IN PLACE OF PLLD NO <br /> TURBINE OUTPUT PRESSURE 33 f PSI TEST PRESSURE TO BE PS1 <br /> TEST PRESSURE APPLIED AT HOURS IMMEDIATE LINE DROP c7r lG LtNES <br /> TIME LINE SRT LINE END X ,0037 RESULTS EST GPH MONITOR ACCUM. GPH TEST <br /> /lav IT 4f _ <br /> 4f- 4- <br /> LINE INCREASE WHEN PRESSURE REMOVED Z TOTAL <br /> BASED UPON CURRENT STANDARDS THE GPH DATA AS SHOWNTHE LINE TO BE CONSIDERED TIGHT. <br /> �--/az3 <br /> TECHNICIAN LICENSE NUMBER TEST HATE <br /> INTEGRITY TANK TESTING SERVICES P.O. BOX 691376 STOCKTON, CALIFORNIA 95269 <br /> (209) 474-1375 (800) 262-8378 <br />