My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1991 - 1996
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EL PINAL
>
1932
>
2300 - Underground Storage Tank Program
>
PR0231097
>
COMPLIANCE INFO_1991 - 1996
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/26/2019 4:16:24 PM
Creation date
12/26/2019 2:55:33 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1991 - 1996
RECORD_ID
PR0231097
PE
2361
FACILITY_ID
FA0004016
FACILITY_NAME
SUSD-CORPORATE YARD
STREET_NUMBER
1932
STREET_NAME
EL PINAL
STREET_TYPE
DR
City
STOCKTON
Zip
95205
APN
11708027
CURRENT_STATUS
01
SITE_LOCATION
1932 EL PINAL DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
225
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
E��V{�QFtTSA NCE1_T1� <br /> . F. <br /> 95 jA% 19 PM I: 2 --N- MONITORING PROCEDURES <br /> UNDERGROUND STORAGE TANK MONITORING PROGRAM <br /> This monitoring program must be kmt at the UST location at all times. The information on this monitorin; <br /> program are conditions of the derating permit. The permit holder must notify San Joaquin County <br /> Environmental Health Division.axone (209) 468-3420 within 30 days of any changes to the monitoring <br /> procedures, unless required to obtain approval before making the change. <br /> R==bzd by Sections 2632(d) and 2641(h) CCR.. <br /> Facility Name Stockton Unified School District, Corporation Yard <br /> Facility Address 1932 N. E1 Pinal Dr. , Stockton, CA 95205 <br /> A Describe the frequ=7. of performing the monitoring: <br /> Tank Precision Tank Testing Annually <br /> Stick Gnti2in$ i)niIg <br /> PipingGasoline Piping is Precision Tested annually with the tank <br /> Diesel piping is pressure tested annually <br /> B. What methods and tcuipment, identified by name and model, will be used for <br /> performing the mor'' g: <br /> Tank Precision testing is contracted <br /> Daily Stick Gauging equipment is (Steil Safety Gage) 1e„el ra„gP <br /> pipingPipe testing is contracted <br /> C. Describe the locati='S) where the monitoring will be performed (facility plot plan <br /> should be attached): <br /> At each tank (see attachedl� of p,l�^n) <br /> D. List the name(s) arc=.'e(s) of the people responsible for performing the monitoring <br /> and/or maintainin; equipment: <br /> Keith Nelson (Vehicle Maintenance Supervisor) <br /> Mark Kralj (Building Division Man gpr) <br /> E. Reporting format .50 monitoring: <br /> Tank Written annual notification to S.J.C. Environmental Health <br /> Piping Written annual notification to S.J.C. Environmental Health <br /> F. Describe the prevez_,e maintenance schedule for the monitoring equipment. Note: <br /> Maintenance must be in accordance with the manufacturers' maintenance schedule <br /> but not less than eve, i,'months: Level gauges are calibrated annually, and any <br /> time an allowable variation is exceeded (Tnventnrg Rernnc; i; 2+i <br /> Procedures) <br /> G. Describe the train- aec-essary for the operation of UST system, including piping, <br /> and the monitorinz wuipment: The system & Monitoring equipment for daily <br /> stick gauging are quite simple and no specialized training is required. <br /> Precision Tank Testing is contracted to a certified tank tester. <br />
The URL can be used to link to this page
Your browser does not support the video tag.