Laserfiche WebLink
SWRCB,January 2002 Page of <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: X Piping Manufacturer ❑Industry Standard ❑Professional Engineer <br /> ❑Other(Spec) <br /> ,st Method Used: X Pressure ❑Vacuum ❑Hydrostatic <br /> ❑Other(Spec) <br /> Test Equipment Used: Pressure Gauge Equipment Resolution: 0-15 PSI <br /> Piping Run # 1 Piping Run#2 Piping Run# Piping Run# <br /> Piping Material: Poly Poly <br /> Piping Manufacturer: Total Containment Total Containment <br /> Piping Diameter: 3" 3" <br /> Length of Piping Run: 50' 15' <br /> Product Stored: I Diesel Regular <br /> Method and location of Test boot Test boot Test boot Test boot <br /> piping-run isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and 5 min 5 min 5 min 5 min <br /> starting test: <br /> Test Start Time: 11:45 12:10 <br /> Initial Reading(RD: 5 PSI 5 PSI <br /> Test End Time: 12:15 12:40 <br /> Final Reading(RF): 5 PSI 5 PSI <br /> Test Duration: 30 min 30 min 30 min 30 min <br /> Change in Reading(RF-RI): 0 0 <br /> Pass/Fail Threshold or 0 drop 0 drop 0 drop 0 drop <br /> -iteria: <br /> est Result: x Pass ❑Fail x Pass ❑Fail ❑ Pass ❑Fail ❑ Pass ❑Fail <br /> Comments— (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />