Laserfiche WebLink
SWRC,3,January 2002 Page of <br /> 7. UNDER-DISPENSER CONTAINMENT C TESTING <br /> Test Method Developed By: ❑UDC Manufacturer ❑Industry Standard X Professional Engineer <br /> ❑Other(Spec) <br /> est Method Used: ❑Pressure ❑Vacuum X Hydrostatic <br /> ❑Other(Spec) <br /> Test Equipment Used: Caldwell Systems Equipment Resolution: .005/30 min <br /> UDC# 1&2 UDC#3&4 UDC#5&6 UDC# <br /> UDC Manufacturer: Total Containment Total Containment Total Containment <br /> UDC Material: Poly Poly Poi <br /> UDC Depth: 32" 32" 32" <br /> Height from UDC Bottom to Top 9" 8" 9" <br /> of Highest Piping Penetration: <br /> Height from UDC Bottom to 18" 4" 5" <br /> Lowest Electrical Penetration: <br /> Condition of UDC prior to Dry Dry Dry <br /> testing: <br /> Portion of UDC Tested 2"Above highest Piping Penetration <br /> Does turbine shut down when <br /> UDC sensor detects liquid(both x Yes ❑No ❑NA x Yes ❑No ❑NA x Yes ❑No ❑NA ❑Yes ❑No F NA <br /> product and water)?* <br /> Turbine shutdown response time <br /> Is system programmed for fail- x Yes ❑No ❑NA x Yes ❑No ❑NA x Yes ❑No LINA ❑Yes ❑No ❑NA <br /> safe shutdown? <br /> Was fail-safe verified to be ❑Yes x No [INA ❑Yes x No ❑NA ❑Yes x No [INA ❑Yes ❑No ❑NA <br /> operational?* <br /> Wait time between applying <br /> pressure/vacuum/water and 5 min 5 min 5 min 5 min <br /> -tarting test <br /> ast Start Time: 12:13 2:20 1:40 <br /> Initial Reading(RI): .00" .00" .00" .00" <br /> Test End Time: 12:43 2:50 2:10 <br /> Final Reading(RF): .00 .0025 .00 <br /> Test Duration: _ 30 min 30 min 30 min 30 min <br /> Change in Reading(RF-Rj): .00 .0025 .00 <br /> Pass/Fail Threshold or Criteria: .005/30 min .005/30 min .005/30 min .005/30 min <br /> Test Result: x Pass ❑Fail x Pass ❑Fail x Pass ❑Fail ❑ Pass ❑Fail <br /> Was sensor removed for testing? x Yes ❑No ❑NA x Yes ❑No ❑NA x Yes ❑No 0N x Yes ❑No ❑NA <br /> Was sensor properly replaced and x Yes ❑No ❑NA x Yes ❑No ❑NA x Yes ❑No ❑NA x Yes ❑No ❑NA <br /> verified functional after testing? <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> the entire depth of the UDC is not tested,specify how much was tested. If the answer to l�of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire UDC must be tested. (See SWRCB LG-160) <br />