My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1998 - 2010
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EL PINAL
>
1932
>
2300 - Underground Storage Tank Program
>
PR0231097
>
COMPLIANCE INFO_1998 - 2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/26/2019 4:09:00 PM
Creation date
12/26/2019 3:07:35 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1998 - 2010
RECORD_ID
PR0231097
PE
2361
FACILITY_ID
FA0004016
FACILITY_NAME
SUSD-CORPORATE YARD
STREET_NUMBER
1932
STREET_NAME
EL PINAL
STREET_TYPE
DR
City
STOCKTON
Zip
95205
APN
11708027
CURRENT_STATUS
01
SITE_LOCATION
1932 EL PINAL DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
334
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Y <br /> Zn-Tank Gauging/SSM Equipment: ❑ Check this box if tank:gauging is used only for inventory control. <br /> ❑ Check this box if no tank gauging or Slit equipment is installed. <br /> 'r <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Com 01ete the foliowine checklist: <br /> �' s ❑ No* Has all input wiring been inspected for proper entry and termination,including testing-for ground faults". j <br /> es ❑ No* Were all tank gauging,probes visually inspected for damage and residue buildup? i <br /> s ❑ Nc* Was accuracy of system product level readings tested? , <br /> es ❑ Ne* ' Was accuracy of system water level readings tested? <br /> es ❑ No* Were all probes reinstalled properly? <br /> 21 Yes ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> *In the Section I3,below,describe how and when these deficiencies were or will be corrected. <br /> G. Une leak Detectors (LLD): ❑ Check this box if LLDs are not installed. <br /> Co £e the following chevclistr <br /> Yes ❑ No* For equipment start-up or annual equipment cation, was a leak simulated to verify LLD performance? <br /> ❑ NIA (Check all that apply) Sitmtlated leak rate: U 3 g.p.h.; ❑0.1 g.p.h; ❑0.2 g.p.h. <br /> ❑ No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> ❑ No* Was the testing apparatus properly calibrated? <br /> Yes ❑ No* For mechanical LLDs,does the LLD restrict product flow if it detects a Ieak? <br /> NIA <br /> Z] Yes ElFor electronic LLDs,does the turbine automatically shut off if the LLD detects a leak:? <br /> NIA <br /> ❑ Yes 13 PI& For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system is disabled <br /> 2 NIA or discomnected? <br /> Yes ❑ o* For electronic LLDs,does the turbine aummatically shut off if any portion of the monitoring system malfunctions <br /> 13 NIA or faits a test? <br /> IZLIJ[ Ye ❑ No* For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> Q NIA j <br /> Yes Cl No's Were all items on the equipment manufacturer's maintenance checklist completed? r <br /> *In the Section K,below,describe how and when these deficiencies were or will be corrected. <br /> EL Comments: <br /> Page 3 of 3 03MI <br /> Y <br /> I <br /> Y <br />
The URL can be used to link to this page
Your browser does not support the video tag.