My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1998 - 2010
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EL PINAL
>
1932
>
2300 - Underground Storage Tank Program
>
PR0231097
>
COMPLIANCE INFO_1998 - 2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/26/2019 4:09:00 PM
Creation date
12/26/2019 3:07:35 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1998 - 2010
RECORD_ID
PR0231097
PE
2361
FACILITY_ID
FA0004016
FACILITY_NAME
SUSD-CORPORATE YARD
STREET_NUMBER
1932
STREET_NAME
EL PINAL
STREET_TYPE
DR
City
STOCKTON
Zip
95205
APN
11708027
CURRENT_STATUS
01
SITE_LOCATION
1932 EL PINAL DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
334
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
01/29/2002 15:02 FAX 01006 <br /> 01/28/2002 10:06 209468343- FIFTH FLOOR PAGE 03 <br /> WRn'aX MONITORING AND RESPONSE PLAN <br /> UNDERGROUND STORAGE T'AN'K MONITORING PROGRAM <br /> This monitoring program must be kept at the UST location at all times.The information on this monitoring progam are <br /> conditions of the operating permit ne permit hold er must natify&nyviromnental 14calih Dcpartnent (209)468-3420 <br /> witkun 30 days of any changes io the monitoring procedures,unless ricquired to obta n approval or a petit it before making <br /> the change.Requhcd by CCR Z632(d)and 2641(h) <br /> FACILITYNAME Stockton Unified School District DATE 1/29/2002. <br /> FACILITY ADDRESS 1932 N El Final <br /> I Name(s)'and Titic(s)of the people responsible for performing the monitoring and/or maintenance <br /> Keith Nelson/Vehicle Maintenance Supervisoz <br /> Shields, Harper & Co_/Stockton Service Station Equipment Co. <br /> 2.Describe the frequency ofperfoxraing the mmnitadn4 fox; Tank Sentinel TS--1000 <br /> TANKS automated system PIPING automated system <br /> 3.Describe the location(s)ofwh=ffie monitoring will be performed. ie;location ofsensors <br /> 2963 Sanguinetti_Laue/Stockton/Transportation Office <br /> 4.Describe thefollowingequipmentfor each underground storage rank <br /> Name and Model of Monitoring panel TS-1000/2—P <br /> Name and Model of Line Leak Detectors r'xly <br /> Name and Model of Annular Sensors OPT <br /> Name and Model of Piping Sensors TSP—ULS <br /> Name and Model of Dispenser Sensors TSP—ULS <br /> Type of overfill prevention Drop tube with overflow preventor valve <br /> 5.Do the lWbine Sensors and Dispenser Pan Scnsors shutdown the turbine? Yesz) NO Q <br /> Does the turbine shut down if a sensor is disconnected? 'Y'esM No 0' <br /> Does the tLubinc shut down is the manitd ing panel loses power? 'Yes xi No 0 <br /> 6.How will the alarm history and subsequent maintenance be recorded? <br /> All activity is recorded in the underground storage tank monitoring log <br /> maintained in the Transportation Office. (2963 Sanguinetti Lane)_ ___ <br /> 7.Maintenance of the monitoring equipment mztst be performed at least once every 12 rnotiths. <br /> Describe the preventive maintenance schedule and rmording for the monitoring equipment.What month will <br /> annual monitoring certifioationbe performed in? Each January monitoring system certification <br /> is performed by an outside vendor. _ <br /> Nole.For newinstallations the secondary eonfathmient must be tested 6mondlrr after installadon.ATI x vndary conlahment syslems <br /> marl 6e tested orrca c+vary$d month+wllh ur�lEal tes71�1g performed before Aecem6er3l,Z003- <br /> 8.Describe the framing necessary for the operation of UST system,iztcluding piping,and the monitoring <br /> equiplt ant_ Training for thQ operation of US system occured upon installation of <br /> the TS-1000 (Tank Sentinel) <br /> l:�rnstemi-ielU$7lmonitorin�pZan.doc <br /> i241l602 <br />
The URL can be used to link to this page
Your browser does not support the video tag.