My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1998 - 2010
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EL PINAL
>
1932
>
2300 - Underground Storage Tank Program
>
PR0231097
>
COMPLIANCE INFO_1998 - 2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/26/2019 4:09:00 PM
Creation date
12/26/2019 3:07:35 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1998 - 2010
RECORD_ID
PR0231097
PE
2361
FACILITY_ID
FA0004016
FACILITY_NAME
SUSD-CORPORATE YARD
STREET_NUMBER
1932
STREET_NAME
EL PINAL
STREET_TYPE
DR
City
STOCKTON
Zip
95205
APN
11708027
CURRENT_STATUS
01
SITE_LOCATION
1932 EL PINAL DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
334
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Jan-03-02 O2 :O3P CHAT+ ON TANK TESTING 916 ?7 7345 P.O4 <br /> F. In-'T'arik (,:tul;in- / Sl ll Etluipntcnt: ❑ Check this bot if tank gauging its used only for inventor} control. <br /> ❑ Check this box if no tank�.;auging nr STR equipment is inszallyd. <br /> 1llS SCCt10i1 1��1i5C be Comp] ted if in-tank El.allr-1111a Cq((ip111e11t 1S USed tc, perform leak detection mcmito i <br /> Complete the follu«inp checklist: <br /> 'es ❑ No* i }las nil input vvirin, been inspected for proper enrty and tern;inntio_n, including trsting for ground faults? <br /> L4'l'cs ❑ i\o' Wer•c all tank z;Vi-sir)^ probes visually inspected ibr damag+c and residue buildup? <br /> 'es D No* Was accuracy'of system product level rcadinss tested:' <br /> Yes J No* Was accur,7Cy of system Nvater level rradirg5 tested`' - <br /> i� �s ❑ Teo' %Vere ail probes reiris;<tlled propr.rly? <br /> tir Yes ❑ Ivo` %Vere all items un the equipment manufacturer'~maintenance checklist compiete.6? <br /> * In the Section 11, belnw, describe how and when these deficiencies were or-will be corrected. <br /> G. kine Leak Detectors (LLD): U Check this box if T.T,Ds arc not.installed. <br /> !etc t!le foilmNichecklisC _ <br /> Y'es ❑ No` 'm equipment start-tip or annual equipment cyriiiicalion. Nvas a leak simulated to verify LLD perfot'manee? <br /> l..l N/A t('1reC-k ali 11+4-11 aplol;) Simulated leak rate: 1.3-1 g.p.h.- L] 0.1 g.p.h : U 0.2 g.p h <br /> Yes ❑ No" Were all T T.Ds confirmed operational and accurate within renulatory requirements? <br /> 'es U No \ti as the apparatus properly calibrated? <br /> U�rj'eS Li For Mech;:ni021 I T.T).;, docs the LL L) restrict product flow jf it detects a leak? <br /> G Yes— �❑ * For electronic T.T.Ds,docs the tui bine automatically shut off if the I.I.D detects a leak'' <br /> ❑ Yes J No* For eleci;onic I.I_Ds. dues the turbine automatically shut off•if any portion of the monitoring system is disabled <br /> N/A or disccmnc_-ted` <br /> ❑ Yes U '�" For cicc:r.)nlc T:T,1)s, sloes the twbine automatically shut off if any portion of the monitorinn system <br /> UT"N/A malf irmi(,�11 or fails a test'? <br /> ❑ Yes ❑ For electron-: LLDs,have all accessible: a irinv C01111ecti0rls been visualh'inspcetcd? <br /> Yes O Noy` Wer.:ell irems on the L�qu(pment rrnanufacrurer's maintenance checklist completed? <br /> In the Section H. below,describe how and when these deficiencies were or«'ill be corrected. — <br /> it. i_'ommenis: _ <br /> Page 3 of 3 03/01 <br />
The URL can be used to link to this page
Your browser does not support the video tag.