My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1998 - 2010
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EL PINAL
>
1932
>
2300 - Underground Storage Tank Program
>
PR0231097
>
COMPLIANCE INFO_1998 - 2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/26/2019 4:09:00 PM
Creation date
12/26/2019 3:07:35 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1998 - 2010
RECORD_ID
PR0231097
PE
2361
FACILITY_ID
FA0004016
FACILITY_NAME
SUSD-CORPORATE YARD
STREET_NUMBER
1932
STREET_NAME
EL PINAL
STREET_TYPE
DR
City
STOCKTON
Zip
95205
APN
11708027
CURRENT_STATUS
01
SITE_LOCATION
1932 EL PINAL DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
334
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' •S W R'CB, January 2002 Page*of <br /> 6. PIPING SUMP TESTING <br /> Test Method Developed By: ❑Sump Manufacturer C industry Standard Professional Engineer <br /> ❑Other(Specifi) <br /> kTest <br /> Method Used: Pressure Vacuum ydrostatic N <br /> C Other(Specify) <br /> quipment Used:('<( ,)f*f/4,ctq ( Tm t-e _��.•� Equipment Resolution: dL <br /> Sump#L Sump# Sump # Sump# <br /> Sump Diameter: L r t <br /> Sump Depth: Y3 t/z h <br /> Sump Material: t <br /> Height from Tank Top to Top of <br /> Highest Piping Penetration: Vit o GY S � <br /> Height from Tank Top to Lowest I <br /> Electrical Penetration: <br /> 11 <br /> Condition of sump prior to testing: D r <br /> Portion of Sump Tested' tl <br /> i' WQ-k r j, <br /> Does turbine shut down when <br /> sump sensor detects liquid(both � 'es ❑No ❑NA ;Yes ONO 0 N ❑Yes UO DNA C Yes No DNA <br /> product and water)?* \ tr <br /> Turbine shutdown response time <br /> Is system programmed for fail-safe {{ <br /> �shutdown? 9Yes ❑No ❑NA �'es ❑No ❑NA ❑Yes No ❑NA ❑Yes ❑10 ; ❑NA <br /> iasferational7* 1Vail-safe verified to be <br /> ❑Yes )5-No ❑NA C Yes o ❑NA ❑Yes O hho CNA ❑Yes ❑ ❑NA <br /> Wait time between(ap lytng # <br /> pressure/vacuum/)Ja d starting (, <br /> test: ID �I,�,vEt -cS �Orr�Ztrt*F-ts P <br /> Test Start Time: pv ' t t 1 <br /> Initial Reading(Ri): F1 CovE (p Fi3S-f-Cayc <br /> Test End Time: gj, 3 <br /> Final Reading(RF): j'—✓yS�. C44e_ <br /> Test Duration: 36r�ikr.r A--S 30 i 4--es ! <br /> Change in Reading(RF-RI): dJ O GEv-- o e- <br /> r i <br /> Pass/Fail Threshold or Criteria: <br /> Test Result: ass C Fail Pass ❑ Fail ❑ Pass ❑ Fail EJ'Pass ❑ Fait <br /> Was sensor removed for testing? lames ❑No ❑NAP-Yes ❑No ❑NA O Yes ❑No ❑14A Qj: es ❑No CNA <br /> Was sensor properly replaced and <br /> verified functional after testin ? rYes ❑No ❑NA Yes ❑No CNA ❑Yes ❑No ❑N1 Yes C No ❑NA <br /> Com ments —(include information on repairs made prior to testing and recommended follow-up for failed tests) <br /> If the entire depth of the sump is not tested,specify how much was tested. If the answer to any of the questions indicated with an <br /> asterisk(*) is"NO"or"NA",the entire sump must be tested. (See SWRCB LG-160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.