Laserfiche WebLink
SWR CB, January 2002 Page -7 of <br /> 9. SPILL/OVERFILL CONTAINMENT BOXES <br /> Facility is Not Equipped With S ill/Overfill Containment Boxes El <br /> Spill/Overfill Containment Boxes are Present, but were Not Tested' <br /> Test Method Developed By: Spill Bucket Manufactr Industry Standard Professional Engineer <br /> 1 <br /> Other(Specify) <br /> Test Method--Used: C Pressure ❑Vacuum G Hydrostatic / <br /> ` ❑Other(Spec) <br /> Test Equipment Used: Equipment'Resolution: <br /> Spill Box# Spill Box# Spill Box# Spill Box# <br /> Bucket Diameter: <br /> Bucket Depth: r' <br /> 1 <br /> Wait time between applying <br /> pressure/vacuum/water ander <br /> starting test: <br /> Test Start Time: <br /> Initial Reading(R,): j <br /> Test End Time: <br /> Final Reading(RF): ~, <br /> Test Duration: <br /> Change in Reading(RF-R,): <br /> Pass/Fail Threshold or <br /> Criteria: <br /> Test Result: ❑ Pass qFail ❑ Pass ❑ Fail ❑ Pass Fail ❑ Pass ❑Fail <br /> Commefits— (include information on repairs made prior to testing, and recommended follow-up fur failed tests <br /> C r-/, zit iL;orn <br />