My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1998 - 2010
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EL PINAL
>
1932
>
2300 - Underground Storage Tank Program
>
PR0231097
>
COMPLIANCE INFO_1998 - 2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/26/2019 4:09:00 PM
Creation date
12/26/2019 3:07:35 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1998 - 2010
RECORD_ID
PR0231097
PE
2361
FACILITY_ID
FA0004016
FACILITY_NAME
SUSD-CORPORATE YARD
STREET_NUMBER
1932
STREET_NAME
EL PINAL
STREET_TYPE
DR
City
STOCKTON
Zip
95205
APN
11708027
CURRENT_STATUS
01
SITE_LOCATION
1932 EL PINAL DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
334
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWR CB, January 2002 Page -7 of <br /> 9. SPILL/OVERFILL CONTAINMENT BOXES <br /> Facility is Not Equipped With S ill/Overfill Containment Boxes El <br /> Spill/Overfill Containment Boxes are Present, but were Not Tested' <br /> Test Method Developed By: Spill Bucket Manufactr Industry Standard Professional Engineer <br /> 1 <br /> Other(Specify) <br /> Test Method--Used: C Pressure ❑Vacuum G Hydrostatic / <br /> ` ❑Other(Spec) <br /> Test Equipment Used: Equipment'Resolution: <br /> Spill Box# Spill Box# Spill Box# Spill Box# <br /> Bucket Diameter: <br /> Bucket Depth: r' <br /> 1 <br /> Wait time between applying <br /> pressure/vacuum/water ander <br /> starting test: <br /> Test Start Time: <br /> Initial Reading(R,): j <br /> Test End Time: <br /> Final Reading(RF): ~, <br /> Test Duration: <br /> Change in Reading(RF-R,): <br /> Pass/Fail Threshold or <br /> Criteria: <br /> Test Result: ❑ Pass qFail ❑ Pass ❑ Fail ❑ Pass Fail ❑ Pass ❑Fail <br /> Commefits— (include information on repairs made prior to testing, and recommended follow-up fur failed tests <br /> C r-/, zit iL;orn <br />
The URL can be used to link to this page
Your browser does not support the video tag.