Laserfiche WebLink
03/10/2009 TUE 14:53 FAX 2094683433 SJC EHD 12001 <br /> ********************* <br /> *** FAX TX REPORT *** <br /> ********************* <br /> TRANSMISSION OK <br /> JOB NO. 2338 <br /> DESTINATION ADDRESS 94648349 <br /> PSWD/SUBADDRESS <br /> DESTINATION ID Stockton Sery Sta Eq Cc <br /> ST. TIME 03/10 14: 50 <br /> USAGE T 03' 26 <br /> PGS. 5 <br /> RESULT OK <br /> San Joaquin County DIRECTOR <br /> PQ N Donna Heran,REHS <br /> �O.•_ ..CO Environmental Health Department ASSISTANT DIRECTOR <br /> Z.- —10-7 600 East Main Street Laurie Cotulla,REHS <br /> a: .a <br /> Stockton, California 95202-3029 PROGRAM COORDINATORS <br /> Carl Borgman,REHS <br /> Mike Huggins,REHS,RDI <br /> �qC%FOR�`P Website:www.sjgov.org/ehd Margaret Lagorio,REHS <br /> Phone: (209)468-3420 Robert McClellon,REHS <br /> Fax: (209)464-0138 Jeff Carruesco,REHS,RDI <br /> Kasey Foley,REHS <br /> March 10,2009 <br /> Mike Flores Sent via Fax and Mail <br /> Stockton Service Station Equipment <br /> 808 N Union Street <br /> Stockton,CA 95205 <br /> Fax: 209-464-8349 <br /> Subject: SUSD, 1932 N El Pinal Drive,Stockton,CA(SR0056662) <br /> The San Joaquin County Environmental Health Department(EHD)has completed the review of <br /> the application for a permit to conduct an EVR phase II upgrade with a Healy tank and vacuum <br /> pump. ISD will not be installed. A new Gasboy dispenser will replace the current gasoline <br /> dispenser. The new dispenser has the same footprint as the old dispenser. The permit has been <br /> approved with the following conditions: <br /> Conditions of approval: <br /> 1. Contact the local fire department, local planning or building department and the San <br /> Joaquin Valley Air Pollution Control District for any applicable permits. <br /> 2. Any changes shall be submitted to the San Joaquin County Environmental Health <br /> Department(EHD) for approval prior to commencing work.All new addenda supercede <br /> the previous ones. <br /> 3. Contact Garrett Backus(209-468-2986)to arrange the following inspection(s)(a 48-hour <br /> notice is required): <br /> a. Inspection of the Incon monitoring panel to verify that the monitoring system is <br /> still intact after completion of the EVR phase II upgrade. <br /> b. Inspection of the gasoline dispenser and under dispenser containment(UDC)to <br /> assure that all leaks in the dispenser piping will drain into the UDC. <br /> 4. A"Certification of Installation/Modification" form shall be submitted by the owner or <br /> the owners'agent[pursuant to(CCR)2635(d)] before this upgrade will be considered <br /> complete by EHD. <br />