My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1998 - 2010
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EL PINAL
>
1932
>
2300 - Underground Storage Tank Program
>
PR0231097
>
COMPLIANCE INFO_1998 - 2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/26/2019 4:09:00 PM
Creation date
12/26/2019 3:07:35 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1998 - 2010
RECORD_ID
PR0231097
PE
2361
FACILITY_ID
FA0004016
FACILITY_NAME
SUSD-CORPORATE YARD
STREET_NUMBER
1932
STREET_NAME
EL PINAL
STREET_TYPE
DR
City
STOCKTON
Zip
95205
APN
11708027
CURRENT_STATUS
01
SITE_LOCATION
1932 EL PINAL DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
334
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATEIR��AL <br /> California State Fire Marshal <br /> CODE INTERPRETATION <br /> Date Issued July 27, 2007 Interpretation 06-124 <br /> Topic Healy Clean Air Separator (CAS) Tank as a "Vapor <br /> Processing Unit <br /> Code Section(s) CFC 5202.13.3.9 <br /> Requested by Don Foster <br /> Gettler-Ryan Inc. <br /> 1364 N. McDowell Blvd, Suite B2 <br /> Petaluma, CA 95954 <br /> The California State Fire Marshal has accepted the UL certification of the <br /> Healy Clean Air Separator(CAS) Tank as a "Vapor Processing Unit". 2001 <br /> CFC Section 5202.13.3.9 indicates that the vent termination from vapor <br /> processing units shall be not less than 8 feet above the processing unit <br /> itself. <br /> All of the Healy Installation materials and the California Air Resources <br /> Board Executive Order VR-202-A exhibits indicate that the underground <br /> storage tank pressure vacuum vent valve termination need only be located <br /> 12 feet above grade. No reference is made to the 8 foot separation <br /> requirement. <br /> We have two Questions for your consideration and interpretation: <br /> 1. Does the UST pressure vacuum vent valve need to be located 8 feet <br /> above the CAS Tank as indicated on the attached Detail 1 <br /> No. The design of the CAS is such that all vapors from the UST are completely <br /> trapped within the "bladder" contained in the CAS. The vent coming from the <br /> CAS is to vent the interstitial space between the bladder and the outside wall of <br /> the CAS. (See footnote below) <br />
The URL can be used to link to this page
Your browser does not support the video tag.