My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1998 - 2010
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EL PINAL
>
1932
>
2300 - Underground Storage Tank Program
>
PR0231097
>
COMPLIANCE INFO_1998 - 2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/26/2019 4:09:00 PM
Creation date
12/26/2019 3:07:35 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1998 - 2010
RECORD_ID
PR0231097
PE
2361
FACILITY_ID
FA0004016
FACILITY_NAME
SUSD-CORPORATE YARD
STREET_NUMBER
1932
STREET_NAME
EL PINAL
STREET_TYPE
DR
City
STOCKTON
Zip
95205
APN
11708027
CURRENT_STATUS
01
SITE_LOCATION
1932 EL PINAL DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
334
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CALIFORNIA CONTRACTOR LICENSE 309105 A-C61/D40 HAZ/HIC <br /> 808 N. UNION ST., STOCKTON, CALIFORNIA 95205 <br /> P.O. BOX 508, STOCKTON, CALIFORNIA 95201 Web Site:www.stocktonservicestation.com <br /> PHONE: 209/464-8333 FAX: 209/464-8349 E-mail:sssecogpacbell.net <br /> SALES SERVICE INSTALLATION OF PETROLEUM DISPENSING AUTOMOTIVE SERVICING EQUIPMENT <br /> March 3, 2009 <br /> City of Stockton <br /> Building.;& Planning <br /> Stockton, CA 95202 <br /> Site: Stockton Unified School Dist. <br /> 1944 N. El Pinal Drive <br /> Stockton, CA 95205 <br /> We are going to install a Phase I1 EVR Vapor Recovery Healy System to the existing one <br /> (1) gasoline dispenser with Model VP 1000 mounted vacuum pump. The pump will be <br /> tied into the existing electrical and vent lines, which will not be modified below grade. <br /> No new electrical conduit will be installed. The clean air separator for above ground tank <br /> will be bolt mounted on a new concrete pad that will be constructed as per engineering <br /> calculations. The associated piping from tank to existing vent will be above ground. <br /> We will install four(4) six inch Bollards and two (2) 4" Bollards as shown on drawing. <br /> Sincerely, <br /> "Mike FCores <br /> 67 <br />
The URL can be used to link to this page
Your browser does not support the video tag.